Raypak Raytherm Finned Water-Tube Water Heaters manual

1
2
3
4
5

Go to page of

A good user manual

The rules should oblige the seller to give the purchaser an operating instrucion of Raypak Raytherm Finned Water-Tube Water Heaters, along with an item. The lack of an instruction or false information given to customer shall constitute grounds to apply for a complaint because of nonconformity of goods with the contract. In accordance with the law, a customer can receive an instruction in non-paper form; lately graphic and electronic forms of the manuals, as well as instructional videos have been majorly used. A necessary precondition for this is the unmistakable, legible character of an instruction.

What is an instruction?

The term originates from the Latin word „instructio”, which means organizing. Therefore, in an instruction of Raypak Raytherm Finned Water-Tube Water Heaters one could find a process description. An instruction's purpose is to teach, to ease the start-up and an item's use or performance of certain activities. An instruction is a compilation of information about an item/a service, it is a clue.

Unfortunately, only a few customers devote their time to read an instruction of Raypak Raytherm Finned Water-Tube Water Heaters. A good user manual introduces us to a number of additional functionalities of the purchased item, and also helps us to avoid the formation of most of the defects.

What should a perfect user manual contain?

First and foremost, an user manual of Raypak Raytherm Finned Water-Tube Water Heaters should contain:
- informations concerning technical data of Raypak Raytherm Finned Water-Tube Water Heaters
- name of the manufacturer and a year of construction of the Raypak Raytherm Finned Water-Tube Water Heaters item
- rules of operation, control and maintenance of the Raypak Raytherm Finned Water-Tube Water Heaters item
- safety signs and mark certificates which confirm compatibility with appropriate standards

Why don't we read the manuals?

Usually it results from the lack of time and certainty about functionalities of purchased items. Unfortunately, networking and start-up of Raypak Raytherm Finned Water-Tube Water Heaters alone are not enough. An instruction contains a number of clues concerning respective functionalities, safety rules, maintenance methods (what means should be used), eventual defects of Raypak Raytherm Finned Water-Tube Water Heaters, and methods of problem resolution. Eventually, when one still can't find the answer to his problems, he will be directed to the Raypak service. Lately animated manuals and instructional videos are quite popular among customers. These kinds of user manuals are effective; they assure that a customer will familiarize himself with the whole material, and won't skip complicated, technical information of Raypak Raytherm Finned Water-Tube Water Heaters.

Why one should read the manuals?

It is mostly in the manuals where we will find the details concerning construction and possibility of the Raypak Raytherm Finned Water-Tube Water Heaters item, and its use of respective accessory, as well as information concerning all the functions and facilities.

After a successful purchase of an item one should find a moment and get to know with every part of an instruction. Currently the manuals are carefully prearranged and translated, so they could be fully understood by its users. The manuals will serve as an informational aid.

Table of contents for the manual

  • Page 1

    Project Nam e / Date Division 23 52 33. 13 - 1 DIVISION 23 52 33 .13 FINNED W A T ER-TUBE WATER H EATERS PART 1 - GENERAL 1.1 SUMMARY A. Section includes g as-fired, copper finned-tube water heaters f or use with a storag e tank. B. Related Sections Specifier Note: Us e as needed 1. Building Servic es Piping – D ivision 23 21 00 2. Breeching, Ch [...]

  • Page 2

    Project Nam e / Date Division 2 3 52 33.13 - 2 1. The water heater(s ) shall be f ired with g as at a rated input of BTU/hr. 2. The water heater(s ) shall be CSA t ested and certif ied with a m inimum therm al efficiency of 82 percent at full fire. 3. The water heater(s ) shall be ASM E inspected and HL W -stamped and National Boar d registered for[...]

  • Page 3

    Project Nam e / Date Division 2 3 52 33.13 - 3 1. The water heater(s ) shall be equip ped to (a), (b), or ( c): a. Provide full m odulation of gas input t o any load con dition as lo w as 20% of the f ull rating of the water heater (5:1 ratio) without f lashback , burning at orifices or impr oper combustion. b. Provide staged con trol of th e gas i[...]

  • Page 4

    Project Nam e / Date Division 2 3 52 33.13 - 4 inlet tem perature is not achieved w ithin the 7-m inute tim e frame. 2. The cold water s tart system s hall be configured with a m odulating three- way valve that is controlled b y a system-m atched PID controller. T he PID c ontroller tem perature sensor s hall be located in the inl et header of the [...]

  • Page 5

    Project Nam e / Date Division 2 3 52 33.13 - 5 1. Safeties (2.2 - F) 2. Operating Contro ls (2.3) 3. Static and full lo ad gas suppl y pressure 4. Gas manifold and blower air pressure C. Submit cop y of start-up rep ort to Architect and Engineer. 3.3 TRAINING A. Provide factor y-authorized s ervice representati ve to train m aintenance personne l o[...]