Patterson-Kelley DVSCM-02 manual

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26

Go to page of

A good user manual

The rules should oblige the seller to give the purchaser an operating instrucion of Patterson-Kelley DVSCM-02, along with an item. The lack of an instruction or false information given to customer shall constitute grounds to apply for a complaint because of nonconformity of goods with the contract. In accordance with the law, a customer can receive an instruction in non-paper form; lately graphic and electronic forms of the manuals, as well as instructional videos have been majorly used. A necessary precondition for this is the unmistakable, legible character of an instruction.

What is an instruction?

The term originates from the Latin word „instructio”, which means organizing. Therefore, in an instruction of Patterson-Kelley DVSCM-02 one could find a process description. An instruction's purpose is to teach, to ease the start-up and an item's use or performance of certain activities. An instruction is a compilation of information about an item/a service, it is a clue.

Unfortunately, only a few customers devote their time to read an instruction of Patterson-Kelley DVSCM-02. A good user manual introduces us to a number of additional functionalities of the purchased item, and also helps us to avoid the formation of most of the defects.

What should a perfect user manual contain?

First and foremost, an user manual of Patterson-Kelley DVSCM-02 should contain:
- informations concerning technical data of Patterson-Kelley DVSCM-02
- name of the manufacturer and a year of construction of the Patterson-Kelley DVSCM-02 item
- rules of operation, control and maintenance of the Patterson-Kelley DVSCM-02 item
- safety signs and mark certificates which confirm compatibility with appropriate standards

Why don't we read the manuals?

Usually it results from the lack of time and certainty about functionalities of purchased items. Unfortunately, networking and start-up of Patterson-Kelley DVSCM-02 alone are not enough. An instruction contains a number of clues concerning respective functionalities, safety rules, maintenance methods (what means should be used), eventual defects of Patterson-Kelley DVSCM-02, and methods of problem resolution. Eventually, when one still can't find the answer to his problems, he will be directed to the Patterson-Kelley service. Lately animated manuals and instructional videos are quite popular among customers. These kinds of user manuals are effective; they assure that a customer will familiarize himself with the whole material, and won't skip complicated, technical information of Patterson-Kelley DVSCM-02.

Why one should read the manuals?

It is mostly in the manuals where we will find the details concerning construction and possibility of the Patterson-Kelley DVSCM-02 item, and its use of respective accessory, as well as information concerning all the functions and facilities.

After a successful purchase of an item one should find a moment and get to know with every part of an instruction. Currently the manuals are carefully prearranged and translated, so they could be fully understood by its users. The manuals will serve as an informational aid.

Table of contents for the manual

  • Page 1

    D I R ECT VE NT/ S EALED COMBUST I ON D I R ECT VE NT/ S EALED COMBUST I ON D I R ECT VE NT/ S EALED COMBUST I ON D I R ECT VE NT/ S EALED COMBUST I ON D I R ECT VE NT/ S EALED COMBUST I ON D I R ECT VE NT/ S EALED COMBUST I ON D I R ECT VE NT/ S EALED COMBUST I ON D I R ECT VE NT/ S EALED COMBUST I ON D I R ECT VE NT/ Patterson-Kelley P .O. Box 45[...]

  • Page 2

    The rm ifi c ® Gas-Fired Boiler Table of Contents 1.0 INTRODUCTION ..................................1 1.1 Code C ompli ance................................ 1 1.1.1 Direct Vent/Sealed Combustion Sy stem .............................................. 1 1.1.2 Fresh A ir Sy stem ........................... 1 1.2 Basi c Inlet/V ent Confi gurations ...[...]

  • Page 3

    The rm ifi c ® Gas-Fire d Boiler Introduction Page 1 1.0 INTRODUCTION Direct vent (ANSI Z21.13) is a closed system m ethod of ducting the combustion air di rectly from the outsi de of the bu ilding into the inlet com partm ent of the burner, an d a sealed e xhaust v ent from the combustion chamber to the outdoor s. The direct v ent/sealed com bust[...]

  • Page 4

    Thermific ® Gas-Fired Boiler Introduction/Sa fety Page 2 Exhaust V ent Air Inlet Sidewall 2. Both the com bustion air inle t and flue g as exhaust through the s i dewall. Exhaust V ent Air Inlet Roof 3. The com bustion air inlet from the roof and the flue gas exhaust t hrough the roof. Exhaust Ve n t Air Inlet Roof Sidewall 4. The com bustion air [...]

  • Page 5

    Thermific ® Gas-Fired Boile r Installation Page 3 Do not manifo ld two (2) or m ore units into a com mon sidewall v ent system withou t provis ions for additiona l forced d raft. 3.0 INST ALLA TION 3.1 C OMPONENTS P ROVIDED The direct v ent/sealed com bustion option i s shippe d with the following item s shipped loose fo r field installa tion: [...]

  • Page 6

    Thermific ® Gas-Fired Boile r Installation Page 4 Whichev er mater ial is use d, the term ination must po int down and must be backed by a metal p late secured to the wall. Importan t: The chosen in let termination m ust be included in the calculation of t he maxim u m allowab l e equivalent length. See Secti on 3.4.5 f or equiv alent lengths. Cor[...]

  • Page 7

    Thermific ® Gas-Fired Boile r Installation Page 5 with the appl ication of heat. Re fer to the manufactu rer's instru ctions. W rap the joint w ith aluminum tape which is backed w ith an ad hesive on the contact side. 3.2.5 Inle t Dampe r and A uxiliary Control Pane l (optiona l) Note: The in let dam per assembly and control panel w ill preve[...]

  • Page 8

    Thermific ® Gas-Fired Boile r Installation Page 6 3.3.3 Exhaust Vent Connection at the Boiler 6' Min. Pitch toward boiler 1/4" per foot min. 3" Min. T rap Loop To s e w e r t r a p or condensa t e pump. Boot T ee/ 135 T ee o Condensate Drain At the outle t of the boiler, an adjustable o r fixed leng th (minim um 2 feet for cle aranc[...]

  • Page 9

    Thermific ® Gas-Fired Boile r Installation Page 7 Whichev er termina tion is chosen, it must be double wall vent ce rtified under UL 1738, or ULC-636. When insta l ling a sid ewall ex haust sy stem the termina tion must be ba cked by a metal pl ate secured to the wall as shown in th e figure. Correct rai n cap, unrestrict ed. T ypical incorrect ra[...]

  • Page 10

    Thermific ® Gas-Fired Boile r Installation Page 8 If the air inle t and/or exhaust v ent terminal ar e through the sidew all, clea rances from othe r exhaust/inlet, windows, doors, building openings, snow line, etc must be as s hown in the figure ab ove. There must b e either 5' vertica l separat ion or 10' horizontal separation between [...]

  • Page 11

    Thermific ® Gas-Fired Boile r Installation/Operation Page 9 3.4.3.2 Se ries 15 00, 170 0, 2000 Air Inlet Exhaust V ent Round Damper 90 Elbow o T ransitio n Duct 27" Min. * 31" * 24" 44" Min. * To D r a i n Boot T ee/ 135 T ee o * Dimension s hown above is ba sed on 12" round duc t wor k. A minimum of 44 inches is requ ired[...]

  • Page 12

    Thermific ® Gas-Fired Boile r Operation/Maintenance Pa ge 10 When the chart is com pleted, set up your boiler' s combustion to the correspondi ng information a t the temperatu re relative during the time of the start up. Enter your 100 º F operationa l range. % Ox ygen % Carbon Dioxide 8 7.2 7.9 7.3 7.8 7.4 7.7 7.4 7.6 7.5 7.5 7.5 7.4 7.6 7.[...]

  • Page 13

    Thermific ® Gas-Fir ed Boiler Wiring Diagrams Pa ge 11 6.0 WIRING DI AGRAMS 6.1 O N -O FF S ERIES 700, 1000, 1200 Wiring Dia gram[...]

  • Page 14

    Thermific ® Gas-Fir ed Boiler Wiring Diagrams Pa ge 12 6.1 O N -O FF S ERIES 700, 1000, 1200 Logic Diagram[...]

  • Page 15

    Thermific ® Gas-Fir ed Boiler Wiring Diagrams Pa ge 13 6.1 A O N -O FF IR I S ERIES 700, 1000, 1200 Wiring Dia gram[...]

  • Page 16

    Thermific ® Gas-Fir ed Boiler Wiring Diagrams Pa ge 14 6.1 A O N -O FF IR I S ERIES 700, 1000, 1200 Logic Diagram[...]

  • Page 17

    Thermific ® Gas-Fir ed Boiler Wiring Diagrams Pa ge 15 6.1 B L O -H I L O Wiring Dia gram[...]

  • Page 18

    Thermific ® Gas-Fir ed Boiler Wiring Diagrams Pa ge 16 6.1 B L O -H I L O Logic Diagram[...]

  • Page 19

    Thermific ® Gas-Fir ed Boiler Wiring Diagrams Pa ge 17 6.1 C L O -H I -L O IR I Wiring Dia gram[...]

  • Page 20

    Thermific ® Gas-Fir ed Boiler Wiring Diagrams Pa ge 18 6.1 C L O -H I -L O IR I Logic Diagram[...]

  • Page 21

    Thermific ® Gas-Fir ed Boiler Wiring Diagrams Pa ge 19 6.1 D O N -O FF S ERIES 1500, 1700, 2000 Wiring Dia gram[...]

  • Page 22

    Thermific ® Gas-Fir ed Boiler Wiring Diagrams Pa ge 20 6.1 D O N -O FF S ERIES 1500, 1700, 2000 Logic Diagram[...]

  • Page 23

    Thermific ® Gas-Fir ed Boiler Wiring Diagrams Pa ge 21 6.1 E O N -O FF IR I S ERIES 1500, 1700, 2000 Wiring Dia gram[...]

  • Page 24

    Thermific ® Gas-Fir ed Boiler Wiring Diagrams Pa ge 22 6.1 E O N -O FF IR I S ERIES 1500, 1700, 2000 Logic Diagram[...]

  • Page 25

    Thermific ® Gas-Fir ed Boiler Wiring Diagrams Pa ge 23 6.2 A UXILIARY C ONTROL P ANEL 6.2.1 On- Off Au xiliary C ontrol P anel[...]

  • Page 26

    Pa g e 2 4[...]