Smith Cast Iron Boilers 28HE manual

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28

Go to page of

A good user manual

The rules should oblige the seller to give the purchaser an operating instrucion of Smith Cast Iron Boilers 28HE, along with an item. The lack of an instruction or false information given to customer shall constitute grounds to apply for a complaint because of nonconformity of goods with the contract. In accordance with the law, a customer can receive an instruction in non-paper form; lately graphic and electronic forms of the manuals, as well as instructional videos have been majorly used. A necessary precondition for this is the unmistakable, legible character of an instruction.

What is an instruction?

The term originates from the Latin word „instructio”, which means organizing. Therefore, in an instruction of Smith Cast Iron Boilers 28HE one could find a process description. An instruction's purpose is to teach, to ease the start-up and an item's use or performance of certain activities. An instruction is a compilation of information about an item/a service, it is a clue.

Unfortunately, only a few customers devote their time to read an instruction of Smith Cast Iron Boilers 28HE. A good user manual introduces us to a number of additional functionalities of the purchased item, and also helps us to avoid the formation of most of the defects.

What should a perfect user manual contain?

First and foremost, an user manual of Smith Cast Iron Boilers 28HE should contain:
- informations concerning technical data of Smith Cast Iron Boilers 28HE
- name of the manufacturer and a year of construction of the Smith Cast Iron Boilers 28HE item
- rules of operation, control and maintenance of the Smith Cast Iron Boilers 28HE item
- safety signs and mark certificates which confirm compatibility with appropriate standards

Why don't we read the manuals?

Usually it results from the lack of time and certainty about functionalities of purchased items. Unfortunately, networking and start-up of Smith Cast Iron Boilers 28HE alone are not enough. An instruction contains a number of clues concerning respective functionalities, safety rules, maintenance methods (what means should be used), eventual defects of Smith Cast Iron Boilers 28HE, and methods of problem resolution. Eventually, when one still can't find the answer to his problems, he will be directed to the Smith Cast Iron Boilers service. Lately animated manuals and instructional videos are quite popular among customers. These kinds of user manuals are effective; they assure that a customer will familiarize himself with the whole material, and won't skip complicated, technical information of Smith Cast Iron Boilers 28HE.

Why one should read the manuals?

It is mostly in the manuals where we will find the details concerning construction and possibility of the Smith Cast Iron Boilers 28HE item, and its use of respective accessory, as well as information concerning all the functions and facilities.

After a successful purchase of an item one should find a moment and get to know with every part of an instruction. Currently the manuals are carefully prearranged and translated, so they could be fully understood by its users. The manuals will serve as an informational aid.

Table of contents for the manual

  • Page 1

    SERIES 28HE GAS OR OIL BOILER INST ALLA TION & OPERA TING INSTR UCTIONS DESIGNED AND TESTED A CCORDING T O A.S.M.E. BOILER AND PRESSURE VESSEL CODE, SECTION IV FOR A MAXIMUM ALLO W ABLE WORKING PRESSURE OF: 15 PSI STEAM OR 80 PSI W A TER. W ARNING: If the inf ormation in this manual is not f ollowed exactl y , a fire or e xplosion may result ca[...]

  • Page 2

    Page 2 SERIES 28HE BOILER INST ALLA TION AND OPERA TION INSTR UCTIONS CONTENTS Bef ore Y ou Star t ................................................. page 2 Boiler Ratings & Capacities ................................ page 2 Boiler Location ................................................... page 2 Combustion Air & V entilation .............[...]

  • Page 3

    Page 3 SERIES 28HE BOILER INST ALLA TION AND OPERA TION INSTR UCTIONS Figure 1 -Service Clearances to Adjacent Construction W ARNING: Never install a 28HE boiler on top of combustib le flooring without consulting the local building authorities f or proper installation guidelines! A minimum c learance of 6 in, 0.15 m must be maintained between the b[...]

  • Page 4

    Page 4 SERIES 28HE BOILER INST ALLA TION AND OPERA TION INSTR UCTIONS All Air From Inside The Buidling If the boiler is to be located in a confined space mini- mum clearances of 24 in , 610 mm must be maintained between the boiler and any adjacent construction. When installed in a confined space, two permanent openings communicating with an additio[...]

  • Page 5

    Page 5 SERIES 28HE BOILER INST ALLA TION AND OPERA TION INSTR UCTIONS Chimney Inspection & Sizing If this boiler will be connected to a masonr y chimney , a thorough inspection of the chimney m ust be perf or med. Ensure that the chimney is clean, properly constructed, lined and properly sized, see Figure 2. T able 2 lists the equivalent breech[...]

  • Page 6

    Page 6 SERIES 28HE BOILER INST ALLA TION AND OPERA TION INSTR UCTIONS W ARNING: Failure to maintain minimum clearances between vent connector s and any combustib le material can result in a fire causing extensive pr operty damage, se vere per sonal injury or death! COMMON VENT SYSTEMS If an e xisting boiler is remov ed from a common venting system,[...]

  • Page 7

    Page 7 SERIES 28HE BOILER INST ALLA TION AND OPERA TION INSTR UCTIONS c) Insof ar as is practical, close all building doors and windows and all doors between the space in which the appliances remaining connected to the common venting system are located and other spaces of the building. T urn on clothes dr y ers and any appliance not connected to th[...]

  • Page 8

    Page 8 SERIES 28HE BOILER INST ALLA TION AND OPERA TION INSTR UCTIONS 2 . Carefully place the back section in position on the angles as shown in Figure 4. W ARNING: The section MUST be fully supported to prevent it fr om falling! Failure to comply with this warning may result pr oper ty damage, severe per sonal injury or death! Figure 4 - Section P[...]

  • Page 9

    Page 9 SERIES 28HE BOILER INST ALLA TION AND OPERA TION INSTR UCTIONS 5 . Inser t the large por t connector with its steel inner ring into the upper port. 6 . Inser t the two round por t connectors into the lower por ts. NO TE: Appl y the spra y adhesive supplied with the boiler to the port recess to hold the por t connector in place if necessary .[...]

  • Page 10

    Page 10 SERIES 28HE BOILER INST ALLA TION AND OPERA TION INSTR UCTIONS 9 . Assemble the rest of the sections f ollowing steps 3 through 8 abov e. 1 0 . Hydrostatically test the boiler by f ollowing the instructions on page 8. 11. While the boiler is being filled confirm that all of the draw r ods are properly tor qued and that there are no leaks. 1[...]

  • Page 11

    Page 11 SERIES 28HE BOILER INST ALLA TION AND OPERA TION INSTR UCTIONS Observation P or t Assembl y , Figure 10 1 . P osition the hinged end of the steel flapper door , item 5, ov er the boss on the obser vation por t cov er , item 4. 2 . Drive the e xpansion pin, item 7, through the hinge bosses to secure the door to the cov er . 3 . Inser t the h[...]

  • Page 12

    Page 12 SERIES 28HE BOILER INST ALLA TION AND OPERA TION INSTR UCTIONS Observation P or t Installation 1 . Screw the f our 5/16-18 x 1 1/2" studs into the tapped holes around the obser vation co v er opening in the back section. 2 . Place the obser vation por t cov er assembly ov er the studs and install the washers and nuts . Tighten the nuts[...]

  • Page 13

    Page 13 SERIES 28HE BOILER INST ALLA TION AND OPERA TION INSTR UCTIONS T ankless Heater Installation - Optional 1 . Clean the heater flange to remove an y r ust or debris. 2 . Install the f our 7/16" x 1 1/2" studs into the tapped holes in the tankless heater flange on the section, Figure 12. Figure 12 - T ankless Heater Installation 3 . [...]

  • Page 14

    Page 14 SERIES 28HE BOILER INST ALLA TION AND OPERA TION INSTR UCTIONS Figure 15 - Back Section T apping Locations T able 5 - Water & Steam T appings Relief & Safety V alve Piping Install the pressure relief or safety v alve in the 3" NPT opening in the top of the back section, Figure 14. W ARNING: The discharge of the pressure relief [...]

  • Page 15

    Page 15 SERIES 28HE BOILER INST ALLA TION AND OPERA TION INSTR UCTIONS Figure 16 - Relief & Safel y V alve Piping W A TER BOILER PIPING The supply and retur n connections should be sized to suit the system, see Figures 14, 15, 17, 18 and T ables 5 & 6. Do not pipe the supply from the bottom por t or the return to the top por t, the boiler w[...]

  • Page 16

    Page 16 SERIES 28HE BOILER INST ALLA TION AND OPERA TION INSTR UCTIONS Figure 17 - Optional Return Y oke Figure 18 - Boiler Contr ol Locations Piping For Use With Cooling Units The boiler , when used in connection with a refr igeration system, must be installed so the chilled medium is piped in parallel with the boiler . Appropriate valves m ust be[...]

  • Page 17

    Page 17 SERIES 28HE BOILER INST ALLA TION AND OPERA TION INSTR UCTIONS Figure 19 - T ypical Single W ater Boiler Piping Figure 20 - T ypical Multiple W ater Boiler Piping[...]

  • Page 18

    Page 18 SERIES 28HE BOILER INST ALLA TION AND OPERA TION INSTR UCTIONS Figure 21 - Chilled Medium Diagram Cleaning of Water Boiler s Nor mally the cleaning of water boilers is unnecessary unless there is unusually hea vy contamination of the boiler or system. The burner must be installed and made operational along with the operating, limit and othe[...]

  • Page 19

    Page 19 SERIES 28HE BOILER INST ALLA TION AND OPERA TION INSTR UCTIONS Minimum F eed W ater Condensate Receiver Boiler I=B=R Gross Output Ev aporation Rate Pumping Rate Capacity Model MBH kW GPM L/hr GPM L/hr Gallons Liters 28HE-S-4 900 264 1.9 7.3 3.9 14.8 37 140 28HE-S-5 1166 342 2.5 9.5 5.0 18.9 48 182 28HE-S-6 1433 420 3.1 11.7 6.2 23.5 59 223 [...]

  • Page 20

    Page 20 SERIES 28HE BOILER INST ALLA TION AND OPERA TION INSTR UCTIONS Figure 23 - T ypical Steam Piping - Gravity Return f or Multiple Boilers Figure 24 - T ypical Steam Piping - Pumped Return f or Multiple Boilers[...]

  • Page 21

    Page 21 SERIES 28HE BOILER INST ALLA TION AND OPERA TION INSTR UCTIONS CA UTION: A v oid skin contact with c leaning solution to prevent injury! If e y e or skin contact occur s flush with large quantities of water . NO TE: Some locations do not allo w this solution to be used. Check with the local authority having jurisdiction. 5 . Mix the cleanin[...]

  • Page 22

    Page 22 SERIES 28HE BOILER INST ALLA TION AND OPERA TION INSTR UCTIONS W ater Boilers Fill the boiler and all of the radiation with water to the required system pressure. Completely purge the system of air and adjust the system pressure as needed. CA UTION: Thermal shock of water boilers m ust be av oided! W ater circulation must be estab lished be[...]

  • Page 23

    Page 23 SERIES 28HE BOILER INST ALLA TION AND OPERA TION INSTR UCTIONS CA UTION: If the flue gas temperature exiting the smoke hood is less than 320 ° F, 160 ° C at full rated input, the number of heat transfer r ods in the boiler must be reduced. Failure to pr otect the boiler from low flue gas temperatures will shorten the life of the boiler an[...]

  • Page 24

    Page 24 SERIES 28HE BOILER INST ALLA TION AND OPERA TION INSTR UCTIONS BOILER MAINTENANCE W ARNING: Servicing, inspection and adjustment of the boiler must be done b y a trained technician in accor dance with all applicable local and national codes. Improper servicing or adjustment can result in property damage, severe per sonal injury or death! Th[...]

  • Page 25

    Page 25 SERIES 28HE BOILER INST ALLA TION AND OPERA TION INSTR UCTIONS Figure 26 - Boiler Assembl y[...]

  • Page 26

    Page 26 SERIES 28HE BOILER INST ALLA TION AND OPERA TION INSTR UCTIONS (1) Smokehood assemb ly includes the smokehood, slide damper , angle brack et and hardware. (2) Cleanout cov er assembly includes the cleanout co v er , insulation, rope and mounting hardware. 1 F ront Section 3621 111111111111111 2 Graphite P or t Connector Set 60375 3456789 1 [...]

  • Page 27

    Page 27 SERIES 28HE BOILER INST ALLA TION AND OPERA TION INSTR UCTIONS 33 Obser vation Glass Co ver Plate 3420 1 11111111111111 ns Rear Observation P ort Hardware 71301 1 1 1 1 1 1 111111111 Burner Mounting Plate Assembly , 9" 70641 Burner Mounting Plate Assembly , 10 1/4" 70640 34 (3) Burner Mounting Plate Assembly , 12 1/2" 70510 B[...]

  • Page 28

    dizziness headaches nausea vision problems loss of muscle control weakness shortness of breath unclear thinking unconsciousness W ARNING Any appliance that burns natural gas, propane gas, fuel oil, wood or coal is capable of producing carbon monoxide (CO). Carbon Monoxide (CO) is a gas which is odorless, colorless and tasteless but is very toxic. I[...]