ParaBody 426103 manual

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45

Go to page of

A good user manual

The rules should oblige the seller to give the purchaser an operating instrucion of ParaBody 426103, along with an item. The lack of an instruction or false information given to customer shall constitute grounds to apply for a complaint because of nonconformity of goods with the contract. In accordance with the law, a customer can receive an instruction in non-paper form; lately graphic and electronic forms of the manuals, as well as instructional videos have been majorly used. A necessary precondition for this is the unmistakable, legible character of an instruction.

What is an instruction?

The term originates from the Latin word „instructio”, which means organizing. Therefore, in an instruction of ParaBody 426103 one could find a process description. An instruction's purpose is to teach, to ease the start-up and an item's use or performance of certain activities. An instruction is a compilation of information about an item/a service, it is a clue.

Unfortunately, only a few customers devote their time to read an instruction of ParaBody 426103. A good user manual introduces us to a number of additional functionalities of the purchased item, and also helps us to avoid the formation of most of the defects.

What should a perfect user manual contain?

First and foremost, an user manual of ParaBody 426103 should contain:
- informations concerning technical data of ParaBody 426103
- name of the manufacturer and a year of construction of the ParaBody 426103 item
- rules of operation, control and maintenance of the ParaBody 426103 item
- safety signs and mark certificates which confirm compatibility with appropriate standards

Why don't we read the manuals?

Usually it results from the lack of time and certainty about functionalities of purchased items. Unfortunately, networking and start-up of ParaBody 426103 alone are not enough. An instruction contains a number of clues concerning respective functionalities, safety rules, maintenance methods (what means should be used), eventual defects of ParaBody 426103, and methods of problem resolution. Eventually, when one still can't find the answer to his problems, he will be directed to the ParaBody service. Lately animated manuals and instructional videos are quite popular among customers. These kinds of user manuals are effective; they assure that a customer will familiarize himself with the whole material, and won't skip complicated, technical information of ParaBody 426103.

Why one should read the manuals?

It is mostly in the manuals where we will find the details concerning construction and possibility of the ParaBody 426103 item, and its use of respective accessory, as well as information concerning all the functions and facilities.

After a successful purchase of an item one should find a moment and get to know with every part of an instruction. Currently the manuals are carefully prearranged and translated, so they could be fully understood by its users. The manuals will serve as an informational aid.

Table of contents for the manual

  • Page 1

    1 Part # 6860801 Revision: 10/12/99 426103 ELASTIC CORD CONVERSION KIT[...]

  • Page 2

    2 P AR TS LIST PA R T # 3102903 6122702 3201501 6271801 3118701 KEY 1 2 3 4 5 QTY 2 4 4 4 4 KEY 6 7 8 9 10 PA R T # 3102501 3102802 3102701 6535001 3102909 DESCRIPTION 3/8” W ASHER 3/8” LOCK NUT 3/8” HEX NUT 3/8” THREADED SHAFT 3/8” X 1” BOL T QTY 4 7 8 3 1 DESCRIPTION 3/8 X 2-1/2” BOL T 3/8 X 1/2” SP ACER SWIVEL SNAP 22” ELASTIC [...]

  • Page 3

    3 STEP 3 • Remove the three 1/4” CAP NUTS and each TENSION CORD from the TOP BOOM as shown in FIGURE 3. FIGURE 3 CORD CAP NUT • Remove the three TENSION CORDS from the D-RING by removing the three KEYHOLE CLEVIS, CLEVIS PINS, and COTTER PINS as shown in 4. FIGURE 4 STEP 4 CORD COTTER PIN CLEVIS PIN[...]

  • Page 4

    FIGURE 5 STEP 5 • Remove the 3/8 X 2” BOL T , two 3/8” W ASHERS, one 2-7/8” L-BRACKETS, one 4-1/2” PULLEY , and one 3/8” LOCK NUT from the upper flat on the BASE as shown in FIGURE 5. FIGURE 6 STEP 6 • SECUREL Y assemble the previously removed 4-1/2” PULLEY to the BASE using one 3/8 X 2-1/2” BOL T (1), two previously removed 3/8?[...]

  • Page 5

    FIGURE 7 STEP 7 • Assemble two 3/8” HEX NUTS (8), two SWIVEL SNAP (3), and two 3/8” LOCK NUTS (7) to the 3/8” THREADED SHAFT (9) as shown in FIGURE 7. BASE 5 10 9 8 HEX NUT 3 7 • Position two 3/8 X 1/2” SP ACERS (2) inside the bracket on the BASE and slide one 3/8” THREADED SHAFT (9) through the bracket. See FIGURE 7. 8 HEX NUT 7 3[...]

  • Page 6

    FIGURE 8 STEP 8 FIGURE 9 STEP 9 6 • Remove the 3/8 X 2-1/4” BOL T , two 3/8” W ASHERS, one 3/8” LOCK NUT , and 3-1/2” PULLEY from the bracket on the T OP BOOM as shown in FIGURE 8. 3/8” LOCK NUT 3/8” X 2-1/4” 3-1/2” PULLEY 3/8” W ASHER TOP BOOM • SECUREL Y assemble the previously removed 3-1/2” PULLEY to the bracket on the T[...]

  • Page 7

    7 FIGURE 10 STEP 10 STEP 1 1 • Assemble three 72” ELASTIC CORDS to the KEYHOLE CLEVIS as shown in FIGURE 11. • Position two 3/8 X 1/2” SP ACERS (2) inside the rear bracket of the TOP BOOM and slide one 3/8” THREAD SHAFT (9) through th e bracket. See FIGURE 10. TOP BOOM 7 8 3/8” HEX NUT 6 9 8 3/8” HEX NUT 6 5 7 5 FIGURE 1 1 • SECUREL[...]

  • Page 8

    FIGURE 12 STEP 12 8 TOP BOOM • Assemble the 22” ELASTIC CORD (4) from the PRESS CABLE around the 2” PULLEY (5) in the TOP BOOM as shown in FIGURE 12. 4 LEG EXT CABLE LA T CABLE PRESS CABLE 5[...]

  • Page 9

    FIGURE 13 STEP 13 9 TOP BOOM • Assemble the 22” ELASTIC CORD (4) from the LEG CABLE around the 2” PULLEY (5) in the TOP BOOM as shown in FIGURE 13. 4 5 LEG EXT CABLE LA T CABLE PRESS CABLE[...]

  • Page 10

    FIGURE 14 STEP 14 10 TOP BOOM • Assemble the 22” ELASTIC CORD (4) from the LA T CABLE around the 2” PULLEY (5) in the T OP BOOM as shown in FIGURE 14. 4 5 LEG EXT CABLE LA T CABLE PRESS CABLE[...]

  • Page 11

    FIGURE 15 STEP 15 11 • Assemble the ELASTIC CORD (4) from the PRESS CABLE to the SWIVEL SNAP (3) on the BASE as shown in FIGURE 15. 3 BASE 4 PRESS CABLE[...]

  • Page 12

    FIGURE 16 STEP 16 12 • Assemble the ELASTIC CORDS (4) from the LA T & LEG CABLES to the corresponding SWIVEL SNAPS (3) on the BASE as shown in FIGURE 16. 3 BASE LA T CABLE 4 LEG CABLE 4[...]

  • Page 13

    13 STEP 18 FIGURE 17 STEP 17 3/8” X 1” BUTTON HEAD CAP SCREW 3/8” X 1” BUTTON HEAD CAP SCREW SHROUD FIGURE 18 • SECUREL Y attach the bottom of the front SHROUD (with label) & rear SHROUD to the T OP BOOM using the four previously removed 3/8” X 1” BUTTON HEAD CAP SCREWS. See FIGURE 18. • SECUREL Y attach the top of the front SHR[...]

  • Page 14

    • If the 445 WEIGHT ST ACK OPTION IS INST ALLED PROCEED T O P AGE 27. • If the 832 LEG PRESS OPTION & 445 WEIGHT ST ACK OPTION ARE INST ALLED PROCEED T O P AGE 35. 425103 with 832 LEG PRESS OPTION INST ALLED 14 STEP 3 • Remove the 1/4” CAP NUTS and each TENSION CORD from the TOP BOOM as shown in FIGURE 3. FIGURE 3 CORD CAP NUT[...]

  • Page 15

    FIGURE 4 STEP 4 • Remove the TENSION CORDS, CLEVIS PINS and COTTER PINS as shown in FIGURE 4. 15 D-RING KEYHOLE CLEVIS CLEVIS PIN COTTER PIN[...]

  • Page 16

    FIGURE 5 STEP 5 • Remove two 3/8 X 2” BOL TS, four 3/8” W ASHERS, two 2-7/8” L-BRACKETS, two 4-1/2” PULLEYS, and two 3/8” LOCK NUTS from the upper flats on the BASE as shown in FIGURE 5. FIGURE 6 STEP 6 • SECUREL Y assemble the previously removed 4-1/2” PULLEYS to the BASE using two 3/8 X 2-1/2” BOL TS (1), four previously removed[...]

  • Page 17

    FIGURE 7 STEP 7 • Remove one 3-1/2” PULLEY , one 3/8 X 2” BOL T , two 3/8” W ASHERS and one 3/8” LOCK NUT from the BASE as shown in FIGURE 7. 3/8 X 2” BOL T 3-1/2” PULLEY BASE 3/8” W ASHER 3/8” LOCK NUT FIGURE 8 BASE 3-1/2” PULLEY 9 8 HEX NUT 3 7 8 HEX NUT 3/8” LOCK NUT 3 17 STEP 8 • Assemble two 3/8” HEX NUTS (8), two SWI[...]

  • Page 18

    FIGURE 9 STEP 9 FIGURE 10 STEP 10 18 • Remove the 3/8 X 2-1/4” BOL T , two 3/8” W ASHERS, one 3/8” LOCK NUT , and 3-1/2” PULLEY from the bracket on the T OP BOOM as shown in FIGURE 9. 3/8” LOCK NUT 3/8” X 2-1/4” 3-1/2” PULLEY 3/8” W ASHER TOP BOOM • SECUREL Y assemble the previously removed 3-1/2” PULLEY to the bracket on th[...]

  • Page 19

    19 FIGURE 1 1 STEP 1 1 STEP 12 • Position two 3/8 X 1/2” SP ACERS (2) inside the rear bracket of the TOP BOOM and slide one 3/8” THREAD SHAFT (9) through th e bracket. See FIGURE 11. TOP BOOM 7 8 3/8” HEX NUT 6 9 8 3/8” HEX NUT 6 5 7 5 • SECUREL Y assemble two 2” PULLEYS (5) to the rear bracket on the TOP BOOM using one 3/8” THREADE[...]

  • Page 20

    FIGURE 14 STEP 14 20 TOP BOOM • Assemble the 72” ELASTIC CORD (4) from the PRESS CABLE around the 2” PULLEY (5) in the TOP BOOM as shown in FIGURE 14. 4 LEG EXT CABLE LA T CABLE PRESS CABLE 5 STEP 13 • Assemble four 72” ELASTIC CORDS to the KEYHOLE CLEVIS as shown in FIGURE 13. FIGURE 13 ELASTIC CORD D-RING KEYHOLE CLEVIS LEG PRESS CABLE[...]

  • Page 21

    STEP 15 21 • Assemble the 72” ELASTIC CORD (4) from the LEG PRESS CABLE around the 2” PULLEY (5) in the TOP BOOM as shown in FIGURE 15. FIGURE 15 TOP BOOM 4 LEG EXT CABLE LA T CABLE PRESS CABLE 5 LEG PRESS CABLE[...]

  • Page 22

    FIGURE 16 STEP 16 TOP BOOM • Assemble the 72” ELASTIC CORD (4) from the LEG EXT CABLE around the 2” PULLEY (5) in the TOP BOOM as shown in FIGURE 16. 4 5 LEG EXT CABLE LA T CABLE PRESS CABLE 22 LEG PRESS CABLE[...]

  • Page 23

    STEP 17 23 • Assemble the 72” ELASTIC CORD (4) from the LA T CABLE around the 2” PULLEY (5) in the T OP BOOM as shown in FIGURE 17. FIGURE 17 TOP BOOM 4 5 LEG EXT CABLE LA T CABLE PRESS CABLE LEG PRESS CABLE[...]

  • Page 24

    FIGURE 18 STEP 18 24 • Assemble the ELASTIC CORDS (4) from the PRESS CABLE and the LEG PRESS CABLE to the corresponding SWIVEL SNAPS (3) on the BASE as shown in FIGURE 18. 3 BASE PRESS CABLE LEG PRESS CABLE[...]

  • Page 25

    FIGURE 19 STEP 19 25 • Assemble the ELASTIC CORDS (4) from the LA T & LEG CABLES to the corresponding SWIVEL SNAPS (3) on the BASE as shown in FIGURE 19. 3 BASE LA T CABLE 4 LEG CABLE 4[...]

  • Page 26

    26 STEP 21 FIGURE 20 STEP 20 3/8” X 1” BUTTON HEAD CAP SCREW 3/8” X 1” BUTTON HEAD CAP SCREW SHROUD FIGURE 21 • SECUREL Y attach the bottom of the front SHROUD (with label) & rear SHROUD to the T OP BOOM using the four previously removed 3/8” X 1” BUTTON HEAD CAP SCREWS. See FIGURE 20. • SECUREL Y attach the top of the front SHR[...]

  • Page 27

    • If the 832 LEG PRESS OPTION & 445 WEIGHT ST ACK OPTION ARE INST ALLED PROCEED T O P AGE 35. 425103 with 445 WEIGHT ST ACK OPTION 27 STEP 3 • Remove the 1/4” CAP NUTS and each TENSION CORD from the TOP BOOM as shown in FIGURE 3. FIGURE 3 CORD CAP NUT[...]

  • Page 28

    28 FIGURE 4 STEP 4 • CAREFULL Y remove the TENSION CORDS by pulling the COTTER PIN and CLEVIS PIN from the KEYHOLE CLEVIS as shown in FIGURE 4. KEYHOLE CLEVIS CLEVIS PIN LEG CURL/EXTENSION CABLE (67247) LA T CABLE (67248) COTTER PIN D-RING • Please discard the previously removed PRESS TENSION CORDS, COTTER PINS and CLEVIS PINS.[...]

  • Page 29

    FIGURE 7 STEP 7 • Assemble two 3/8” HEX NUTS (8), two SWIVEL SNAP (3), and two 3/8” LOCK NUTS (7) to the 3/8” THREADED SHAFT (9) as shown in FIGURE 7. BASE 29 10 9 8 HEX NUT 3 7 • Position two 3/8 X 1/2” SP ACERS (2) inside the bracket on the BASE and slide one 3/8” THREADED SHAFT (9) through the bracket. See FIGURE 7. 8 HEX NUT 7 3[...]

  • Page 30

    FIGURE 8 STEP 8 30 • Remove the 3/8 X 2-1/4” BOL T , two 3/8” W ASHERS, one 3/8” LOCK NUT , and 3-1/2” PULLEY from the bracket on the T OP BOOM as shown in FIGURE 8. 3/8” LOCK NUT 3/8” X 2-1/4” 3-1/2” PULLEY 3/8” W ASHER TOP BOOM FIGURE 9 STEP 9 • SECUREL Y assemble the previously removed 3-1/2” PULLEY to the bracket on the [...]

  • Page 31

    FIGURE 1 1 STEP 1 1 31 TOP BOOM • Assemble the 72” ELASTIC CORD (4) from the LA T CABLE around the 2” PULLEY (5) in the T OP BOOM as shown in FIGURE 1 1. 4 LEG EXT CABLE LA T CABLE 5 STEP 10 • Assemble two 72” ELASTIC CORDS to the KEYHOLE CLEVIS as shown in FIGURE 10. (NOTE: The LA T or LEG CABLE can be moved over one hole on the D-RING s[...]

  • Page 32

    FIGURE 12 STEP 12 32 TOP BOOM • Assemble the 72” ELASTIC CORD (4) from the LEG EXT CABLE around the 2” PULLEY (5) in the TOP BOOM as shown in FIGURE 12. 4 LA T CABLE LEG EXT CABLE 5[...]

  • Page 33

    FIGURE 13 STEP 13 33 • Assemble the ELASTIC CORDS (4) from the LA T & LEG EXT CABLES to the corresponding SWIVEL SNAPS (3) on the BASE as shown in FIGURE 13. 3 BASE LA T CABLE 4 LEG CABLE 4[...]

  • Page 34

    34 STEP 15 FIGURE 14 STEP 14 3/8” X 1” BUTTON HEAD CAP SCREW 3/8” X 1” BUTTON HEAD CAP SCREW SHROUD FIGURE 15 • SECUREL Y attach the bottom of the front SHROUD (with label) & rear SHROUD to the T OP BOOM using the four previously removed 3/8” X 1” BUTTON HEAD CAP SCREWS. See FIGURE 15. • SECUREL Y attach the top of the front SHR[...]

  • Page 35

    • If the 445 WEIGHT ST ACK OPTION IS INST ALLED PROCEED TO P AGE 27. • If the 832 LEG PRESS OPTION IS INST ALLED PROCEED T O P AGE 14. 425103 with 832 LEG PRESS OPTION & 445 WEIGHT ST ACK OPTION INST ALLED 35 STEP 3 • Remove the 1/4” CAP NUTS and each TENSION CORD from the TOP BOOM as shown in FIGURE 3. FIGURE 3 CORD CAP NUT[...]

  • Page 36

    FIGURE 4 STEP 4 • Remove the TENSION CORDS, CLEVIS PINS and COTTER PINS as shown in FIGURE 4. 36 D-RING KEYHOLE CLEVIS CLEVIS PIN COTTER PIN[...]

  • Page 37

    FIGURE 5 STEP 5 • Remove two 3/8 X 2” BOL TS, four 3/8” W ASHERS, two 2-7/8” L-BRACKETS, two 4-1/2” PULLEYS, and two 3/8” LOCK NUTS from the upper flats on the BASE as shown in FIGURE 5. FIGURE 6 STEP 6 • SECUREL Y assemble the previously removed 4-1/2” PULLEYS to the BASE using two 3/8 X 2-1/2” BOL TS (1), four previously removed[...]

  • Page 38

    FIGURE 7 STEP 7 • Remove one 3-1/2” PULLEY , one 3/8 X 2” BOL T , two 3/8” W ASHERS and one 3/8” LOCK NUT from the BASE as shown in FIGURE 7. 3/8 X 2” BOL T 3-1/2” PULLEY BASE 3/8” W ASHER 3/8” LOCK NUT FIGURE 8 BASE 3-1/2” PULLEY 9 8 HEX NUT 3 7 8 HEX NUT 3/8” LOCK NUT 3 38 STEP 8 • Assemble two 3/8” HEX NUTS (8), two SWI[...]

  • Page 39

    FIGURE 9 STEP 9 39 • Remove the 3/8 X 2-1/4” BOL T , two 3/8” W ASHERS, one 3/8” LOCK NUT , and 3-1/2” PULLEY from the bracket on the TOP BOOM as shown in FIGURE 9. 3/8” LOCK NUT 3/8” X 2-1/4” 3-1/2” PULLEY 3/8” W ASHER TOP BOOM FIGURE 10 STEP 10 • SECUREL Y assemble the previously removed 3-1/2” PULLEY to the bracket on the[...]

  • Page 40

    FIGURE 1 1 STEP 1 1 40 TOP BOOM 3/8” X 1” 10 6 5 7 3/8” LOCK NUT • SECUREL Y assemble one 3/8 X 1” BOL T (10), one 3/8” W ASHER (6), one 2” PULLEY (5) and one 3/8” LOCK NUT (7) to the bracket on the TOP BOOM as shown in FIGURE 11. STEP 12 • Assemble the 72” ELASTIC CORD (4) from the LEG PRESS CABLE around the 2” PULLEY (5) in [...]

  • Page 41

    FIGURE 15 STEP 15 TOP BOOM • Assemble the 22” ELASTIC CORD (4) from the LEG EXT CABLE around the 2” PULLEY (5) in the TOP BOOM as shown in FIGURE 15. 4 5 LEG EXT CABLE LA T CABLE 41 LEG PRESS CABLE STEP 14 • Assemble three 72” ELASTIC CORDS to the KEYHOLE CLEVIS as shown in FIGURE 14. FIGURE 14[...]

  • Page 42

    FIGURE 16 STEP 16 TOP BOOM • Assemble the 72” ELASTIC CORD (4) from the LA T CABLE around the 2” PULLEY (5) in the T OP BOOM as shown in FIGURE 16. 4 5 LEG EXT CABLE LA T CABLE 42 LEG PRESS CABLE[...]

  • Page 43

    FIGURE 17 STEP 17 43 • Assemble the ELASTIC CORDS (4) from the PRESS CABLEand the LEG PRESS CABLE to the coresponding SWIVEL SNAPS (3) on the BASE as shown in FIGURE 17. 3 BASE LEG PRESS CABLE[...]

  • Page 44

    FIGURE 18 STEP 18 44 • Assemble the ELASTIC CORDS (4) from the LA T & LEG CABLES to the corresponding SWIVEL SNAPS (3) on the BASE as shown in FIGURE 18. 3 BASE LA T CABLE 4 LEG CABLE 4[...]

  • Page 45

    45 STEP 20 FIGURE 19 STEP 19 3/8” X 1” BUTTON HEAD CAP SCREW 3/8” X 1” BUTTON HEAD CAP SCREW SHROUD FIGURE 20 • SECUREL Y attach the bottom of the front SHROUD (with label) & rear SHROUD to the T OP BOOM using the four previously removed 3/8” X 1” BUTTON HEAD CAP SCREWS. See FIGURE 20. • SECUREL Y attach the top of the front SHR[...]