Lochinvar SPS0250 manual

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16

Go to page of

A good user manual

The rules should oblige the seller to give the purchaser an operating instrucion of Lochinvar SPS0250, along with an item. The lack of an instruction or false information given to customer shall constitute grounds to apply for a complaint because of nonconformity of goods with the contract. In accordance with the law, a customer can receive an instruction in non-paper form; lately graphic and electronic forms of the manuals, as well as instructional videos have been majorly used. A necessary precondition for this is the unmistakable, legible character of an instruction.

What is an instruction?

The term originates from the Latin word „instructio”, which means organizing. Therefore, in an instruction of Lochinvar SPS0250 one could find a process description. An instruction's purpose is to teach, to ease the start-up and an item's use or performance of certain activities. An instruction is a compilation of information about an item/a service, it is a clue.

Unfortunately, only a few customers devote their time to read an instruction of Lochinvar SPS0250. A good user manual introduces us to a number of additional functionalities of the purchased item, and also helps us to avoid the formation of most of the defects.

What should a perfect user manual contain?

First and foremost, an user manual of Lochinvar SPS0250 should contain:
- informations concerning technical data of Lochinvar SPS0250
- name of the manufacturer and a year of construction of the Lochinvar SPS0250 item
- rules of operation, control and maintenance of the Lochinvar SPS0250 item
- safety signs and mark certificates which confirm compatibility with appropriate standards

Why don't we read the manuals?

Usually it results from the lack of time and certainty about functionalities of purchased items. Unfortunately, networking and start-up of Lochinvar SPS0250 alone are not enough. An instruction contains a number of clues concerning respective functionalities, safety rules, maintenance methods (what means should be used), eventual defects of Lochinvar SPS0250, and methods of problem resolution. Eventually, when one still can't find the answer to his problems, he will be directed to the Lochinvar service. Lately animated manuals and instructional videos are quite popular among customers. These kinds of user manuals are effective; they assure that a customer will familiarize himself with the whole material, and won't skip complicated, technical information of Lochinvar SPS0250.

Why one should read the manuals?

It is mostly in the manuals where we will find the details concerning construction and possibility of the Lochinvar SPS0250 item, and its use of respective accessory, as well as information concerning all the functions and facilities.

After a successful purchase of an item one should find a moment and get to know with every part of an instruction. Currently the manuals are carefully prearranged and translated, so they could be fully understood by its users. The manuals will serve as an informational aid.

Table of contents for the manual

  • Page 1

    Solar Pump Station Installation and Operation Manual SPS0250, SPS0500 & SPS1000 This manual must only be used by a qualified heating installer/ service technician. Read all instructions, before installing. Perform steps in the order given. Failure to comply could result in severe personal injury, death, or substantial property damage.  WARNI[...]

  • Page 2

    2 Hazard definitions The following defined terms are used throughout this manual to bring attention to the presence of hazards of various risk levels or to important information concerning the life of the product.  DANGER  WARNING  CAUTION CAUTION NOTICE DANGER indicates an imminently hazardous situation which, if not avoided, will result [...]

  • Page 3

    3 1 General Information Before starting work, the Installer must read, understand and note these installation and operating instructions.  WARNING The solar pump station may only be installed and maintained by trained professionals. Trainees may only work on the product under the supervision of an experienced person.  WARNING All instructions[...]

  • Page 4

    4 Included Components Solar Station: ■ Grundfos solar circulation pump ■ VFS sensor (flow sensor) ■ 145 psi relief valve, with pressure gauge ■ Multi-function instruments (Flow Check, Thermometer, Fill Valve) ■ EPP two-part bracket with mounting kit Installation kit: ■ Wall and tank bracket with mounting kit 1 General Information Solar [...]

  • Page 5

    5 2 Installing the solar station Installing the solar station on a wall ■ Remove front insulation shell. ■ The solar pump station forms a single unit with the wall bracket and rear insulation shell. Secure both components as a complete unit at the intended location, working the front and using anchors and screws suitable for the wall constructi[...]

  • Page 6

    6 3 Technology, installation and commissioning Clamp ring screw connections ■ Cut the copper pipe to length and deburr. ■ First, slide the clamp ring nut over the pipe, then slide the clamp ring. ■ Insert the prepared pipe into the screw connection until its stop is reached. ■ Tighten clamp ring nut by hand. ■ Use open-ended wrench to tig[...]

  • Page 7

    7 4 Commissioning the solar system General ■ Before commissioning, all piping, connections and saftey equipment should be checked to ensure that they are correctly installed. ■ All pre-fitted solar station screw connections are firmly tightened in the factory so that they do not usually need retightening. ■ Seal integrity must be tested when [...]

  • Page 8

    Solar group with Grundfos UPS 25-58U pump (and GF sensor 0.5-3 GPM) residual delivery height 0 5 10 15 20 25 0,0 0,5 1,0 1,5 2,0 2,5 3,0 3,5 4,0 V olumetric flow rate [GPM] Residual delivery height [Ft] Max. residual delivery height pressure drop of components Solar group with Grundfos UPS 25-99U pump (and GF-Sensor 0.5-10.5 GPM) residual delivery [...]

  • Page 9

    9 6 VFS flow sensor Figure 6-1 VFS 1-12 flow ouput signal VFS 1-12 output signal ow Assignment of m easurement range: 0.26-3.17 gpm i s eq ual to 0.5-3.5V Flow rate calculation: Q = 0.26gpm + [(U-0.5)V/3V]*2 .91gpm Figure 6-3 VFS 2-40 flow output signal VFS 2-40 output signal ow Assignment of m easurement range: 0.53-10.6gpm is eq ual to 0.5-[...]

  • Page 10

    10 7 Technical data for solar station Designation SPS0250 / SPS0500 SPS1000 PUMP SPS0250: Grundfos UPS 25 - 58 U SPS1000: Grundfos U P 2 5 - 120 U SPS0500: Grundfos UPS 25 - 99 U SOLAR AND TANK CONNECTIONS 3/4" compression 1" compression EXPANSION TANK CONNECTION 1/2" NPT INSTALLATION OPTIONS Wall mounting HOLDING PLATE FOR WALL MOUN[...]

  • Page 11

    11 7 Technical data for solar station (continued) Designation SPS0250 / SPS0500 SPS1000 GRAVITY BRAKES Installation location: forward flow and return ball valves Material: Brass Seal: O-ring 70 EPDM 291 Opening pressure: 2 x 200 mm WS (using metal spring) Can be positioned by moving thermometer handle to 45 ° F position Max temp 356 ° F SOLAR DIA[...]

  • Page 12

    8 Component breakdown 20 3 2 4+5 12+15 25 8+9 22 14 11 23 16 13 26 30 27 24 4 6 17 19 1 10 18 7+9 21 SPS0250/ SPS0500 Item Name – SPS0250 - Pumpstation 250 sq-ft w/ flow sensor and CU – SPS0500 - Pumpstation 500 sq-ft w/ flow sensor and CU 1 Solar return ball valve USA 1 1/2" x M28 x 1.5 2 Solar forw. flow ball valve USA M28 x 1.5M28 3 Sol[...]

  • Page 13

    2 27 4+5 3 19 30 31 11 6+7 9 13 21 4 12 29 17 20+22 10 24 1 18 23 32 8 25 16 26 28 33 34 35 Figure 9-2 SPS1000 8 Component breakdown (continued) 13 SPS1000 Item Name – Pumpstation 1000 sq-ft w/ flow sensor and CU 1 Solar return ball valve 1 1/2" Fl. x M36 x 1.5 incl. CV 2 Solar forw. flow ball valve M28 x 1.5 x M36 x 1.5 incl. CV 3 Solar ble[...]

  • Page 14

    14 9 Service De-energize and lock the solar control and pump to prevent them from accidentally being switched back on again by mistake before any maintenance or repair work. Service is not permitted until components and solar liquid have cooled.  WARNING ■ The solar station features an air separator. Open bleeder valve until the solar liquid e[...]

  • Page 15

    15 10 Faults, causes and rectification Pump doesn’t run when power is switched on : ■ Check solar control unit for correct settings and tight wire connections. ■ Check fuses. ■ Check pump voltage, refer to the pump rating plate for requirements. ■ Close shut-off instruments upstream and downstream of pump at high liquid temperatures and s[...]

  • Page 16

    Revision Notes: Revision A (ECO C06520) initial release. Revision B (ECO C07610) reflects formatting adjustments. SL-PS-I-O Rev B 3/11[...]