Field Controls GSK-3 manual

1
2
3
4

Go to page of

A good user manual

The rules should oblige the seller to give the purchaser an operating instrucion of Field Controls GSK-3, along with an item. The lack of an instruction or false information given to customer shall constitute grounds to apply for a complaint because of nonconformity of goods with the contract. In accordance with the law, a customer can receive an instruction in non-paper form; lately graphic and electronic forms of the manuals, as well as instructional videos have been majorly used. A necessary precondition for this is the unmistakable, legible character of an instruction.

What is an instruction?

The term originates from the Latin word „instructio”, which means organizing. Therefore, in an instruction of Field Controls GSK-3 one could find a process description. An instruction's purpose is to teach, to ease the start-up and an item's use or performance of certain activities. An instruction is a compilation of information about an item/a service, it is a clue.

Unfortunately, only a few customers devote their time to read an instruction of Field Controls GSK-3. A good user manual introduces us to a number of additional functionalities of the purchased item, and also helps us to avoid the formation of most of the defects.

What should a perfect user manual contain?

First and foremost, an user manual of Field Controls GSK-3 should contain:
- informations concerning technical data of Field Controls GSK-3
- name of the manufacturer and a year of construction of the Field Controls GSK-3 item
- rules of operation, control and maintenance of the Field Controls GSK-3 item
- safety signs and mark certificates which confirm compatibility with appropriate standards

Why don't we read the manuals?

Usually it results from the lack of time and certainty about functionalities of purchased items. Unfortunately, networking and start-up of Field Controls GSK-3 alone are not enough. An instruction contains a number of clues concerning respective functionalities, safety rules, maintenance methods (what means should be used), eventual defects of Field Controls GSK-3, and methods of problem resolution. Eventually, when one still can't find the answer to his problems, he will be directed to the Field Controls service. Lately animated manuals and instructional videos are quite popular among customers. These kinds of user manuals are effective; they assure that a customer will familiarize himself with the whole material, and won't skip complicated, technical information of Field Controls GSK-3.

Why one should read the manuals?

It is mostly in the manuals where we will find the details concerning construction and possibility of the Field Controls GSK-3 item, and its use of respective accessory, as well as information concerning all the functions and facilities.

After a successful purchase of an item one should find a moment and get to know with every part of an instruction. Currently the manuals are carefully prearranged and translated, so they could be fully understood by its users. The manuals will serve as an informational aid.

Table of contents for the manual

  • Page 1

    GAS SPILLAGE SENSING KIT Model: GSK-3, GSK-4, GSK-250M Installation of a spillage SAFETY Switch is recomme nded for LP and Natural ga s fired systems with draft hoods, draft diverter, or gas barometric draft controls. This device is installed to detect flue gas spillage caused by a blocked flue system and/ or inadequate draft. This device MUST be i[...]

  • Page 2

    Page 2 INSTALLATION ON DRAFT HOODS I N -L INE H ORIZONTAL D RAF T H OOD (See Figures 1 & 2) 1. Two (2) switches are re commended on these hoods. Mount the switches approximately 2 1/2 inche s from the opposite ends and sides of the draft hood opening. (See Fi gure 1 ) 2. The switch should not contact the metal. They shoul d be mounted at least [...]

  • Page 3

    Page 3 D RA FT C ONTROLS (See Figures 7 & 8) NOTE: GSK style switche s are designed for draft control models 4" MG1 th rough 9" MG1. Larger size draft controls require the FTS Series switches. 1. Locate the spill switch along the bottom edge of the draft control ring. (See Figure 7) Mark and drill a 5/32" dia. hole through the ri[...]

  • Page 4

    Page 4 750 M ILLIVOLT P ILOT G ENERATOR A PPLICA TIONS 1. Disconnect the hot lead between the thermostat and the TH terminal on the gas valv e. On older bl eed tube style equipment split one lead of the E.C.O. (energy cut off) circuit. 2. Wire the spill switch or switch es into series with this circuit by wiring from the therm ostat to the spi ll s[...]