Enterasys Enterasys Diamond Distributed Forwarding Engine 7KR4297-02 manual

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64

Go to page of

A good user manual

The rules should oblige the seller to give the purchaser an operating instrucion of Enterasys Enterasys Diamond Distributed Forwarding Engine 7KR4297-02, along with an item. The lack of an instruction or false information given to customer shall constitute grounds to apply for a complaint because of nonconformity of goods with the contract. In accordance with the law, a customer can receive an instruction in non-paper form; lately graphic and electronic forms of the manuals, as well as instructional videos have been majorly used. A necessary precondition for this is the unmistakable, legible character of an instruction.

What is an instruction?

The term originates from the Latin word „instructio”, which means organizing. Therefore, in an instruction of Enterasys Enterasys Diamond Distributed Forwarding Engine 7KR4297-02 one could find a process description. An instruction's purpose is to teach, to ease the start-up and an item's use or performance of certain activities. An instruction is a compilation of information about an item/a service, it is a clue.

Unfortunately, only a few customers devote their time to read an instruction of Enterasys Enterasys Diamond Distributed Forwarding Engine 7KR4297-02. A good user manual introduces us to a number of additional functionalities of the purchased item, and also helps us to avoid the formation of most of the defects.

What should a perfect user manual contain?

First and foremost, an user manual of Enterasys Enterasys Diamond Distributed Forwarding Engine 7KR4297-02 should contain:
- informations concerning technical data of Enterasys Enterasys Diamond Distributed Forwarding Engine 7KR4297-02
- name of the manufacturer and a year of construction of the Enterasys Enterasys Diamond Distributed Forwarding Engine 7KR4297-02 item
- rules of operation, control and maintenance of the Enterasys Enterasys Diamond Distributed Forwarding Engine 7KR4297-02 item
- safety signs and mark certificates which confirm compatibility with appropriate standards

Why don't we read the manuals?

Usually it results from the lack of time and certainty about functionalities of purchased items. Unfortunately, networking and start-up of Enterasys Enterasys Diamond Distributed Forwarding Engine 7KR4297-02 alone are not enough. An instruction contains a number of clues concerning respective functionalities, safety rules, maintenance methods (what means should be used), eventual defects of Enterasys Enterasys Diamond Distributed Forwarding Engine 7KR4297-02, and methods of problem resolution. Eventually, when one still can't find the answer to his problems, he will be directed to the Enterasys service. Lately animated manuals and instructional videos are quite popular among customers. These kinds of user manuals are effective; they assure that a customer will familiarize himself with the whole material, and won't skip complicated, technical information of Enterasys Enterasys Diamond Distributed Forwarding Engine 7KR4297-02.

Why one should read the manuals?

It is mostly in the manuals where we will find the details concerning construction and possibility of the Enterasys Enterasys Diamond Distributed Forwarding Engine 7KR4297-02 item, and its use of respective accessory, as well as information concerning all the functions and facilities.

After a successful purchase of an item one should find a moment and get to know with every part of an instruction. Currently the manuals are carefully prearranged and translated, so they could be fully understood by its users. The manuals will serve as an informational aid.

Table of contents for the manual

  • Page 1

    8.5x11-inch cover with bleed on 4 sides Enterasys Matrix TM DFE-Diamond Series Hardware Installation Guide 7KR4297-02 7KR4297-04 P/N 9034365-01[...]

  • Page 2

    [...]

  • Page 3

    i Notice Enterasys Networks  reserves  the  right  to  make  changes  in  specifications  and  other  information  contained  in  this  document  and  its  web  si te  without  prior  notice.  The  reader  should  in  all  cases  co nsult  Enterasys Netw orks [...]

  • Page 4

    ii Regulatory Compliance Information Federal Communications Commission (FCC) Notice This  device  complie s  with  Par t  15  of  the  FCC  ru les.  Operation  is  subject  to  the  following  two  conditions:  (1)  this  device  may  not  cause  harmful  interference,  a[...]

  • Page 5

    iii Electromagnetic Compatibility (EMC) This  product  complies  with  the  following:  47  CFR  Par t s  2  and  15,  CSA  C108.8,  2004/108/EC,  EN  55022,  EN  61000 ‐ 3 ‐ 2,  EN 61000 ‐ 3 ‐ 3,  EN  55024,  AS/NZS  CISPR  22,  VCCI  V ‐ 3.  Compatibilidad [...]

  • Page 6

    iv ѻ ѻ ક䇈ᯢк䰘ӊ Supplement to Product Instructions ᳝↦᳝ᆇ⠽䋼៪ܗ㋴ (Hazardous Substance) 䚼ӊৡ⿄ (Parts) 䪙 3E ∲ +J 䬝 &G ݁Ӌ䫀 &U   ໮⒈㘨㣃 3%% ໮⒈Ѡ㣃䝮 3%'( 䞥ሲ䚼ӊ (Metal Parts) hƻ ƻ h ƻ ƻ ⬉䏃῵ഫ ( Circuit [...]

  • Page 7

    v VCCI Notice This  is  a  class  A  product  based  on  the  standard  of  the  Vo l u n t a r y  Contro l  Council  for  Interfer ence  by  Information  T echnology  Equipment  (VCCI).  If  this  equipm ent  is  used  in  a  domestic  environme nt,  radio[...]

  • Page 8

    vi Declaration of Conformity Application  of  Co uncil  Directiv e(s): 2004/108/EC 2006/95/EC Manufacturer ’ s  Name : Enterasys Networks, Inc. Manufacturer ’ s  Address: 50  Minuteman  Road Andover ,  MA  01810 USA European  Representative  Addre ss: Enterasys Networks,  Ltd. Nexus  House,  Newbury [...]

  • Page 9

    vii 2. RESTRICTIONS. Except  as  otherwise  authorized  in  writing  by  Enterasys,  You  may  not,  nor  may  You  permit  any  third  party  to: (a) Reverse  engineer ,  decompile,  disassemble  or  modif y  the  Program,  in  whole  or  in  part,  includ[...]

  • Page 10

    viii 7. LIMITATION  OF  LIABILITY. IN  NO  EVENT  SHALL  ENTERA SYS  OR  ITS  SUPPLIERS  BE  LI ABLE  FOR  ANY  DAMAGES  WHATSOEVER  (INCLUDING,  WITHOUT  LIMITATION,  DAMAGES  FO R  LOSS  OF  BUSINESS,  PROFI TS,  BUSINESS  IN TERRUPTION,  LOSS  OF  BUSINESS [...]

  • Page 11

    ix Contents About This Guide Who Should Use This G uide .............. ............. ................ ............. ................ ............. ................ ............. ........... xi How to Use This Guide ....................... ............. ................ ............. ............. ................ ........... ............... .......[...]

  • Page 12

    x Chapter 4: Troubleshooting Using LANVIEW ....... ................ ............. ................ ............. ............. ................ ............. ...... .......................... .. 4-1 Troubleshooting Checklist ............... ............. ................ ............. ............. ................ ............. .. ................[...]

  • Page 13

    Matrix DFE-Platinum Series Module Installation Guide xi About This Guide This  guide  provides  an  overview ,  installation  and  tr oubleshooting  instructions,  and  specifications  for  the  Enterasys  Matrix ™  DFE ‐ Diamond  7KR4297 ‐ 02  and  7KR4297 ‐ 04  modules  and  t[...]

  • Page 14

    How to Use This Guide xii About This Guide How to Use This Guide This  preface  provides  an  overview  of  this  guide  and  the  DFE ‐ Diamond  Series  manual  set,  a  brief  summary  of  each  chapter ,  and  defines  the  conventions  used  in  thi s  document. [...]

  • Page 15

    Document Conventions Matrix DFE-Platinum Series Module Installation Guide xiii Document Conventions The  following  typographical  conventions  and  icons  are  used  in  this  document. Commonly Used Acronyms The  following  acronyms  are  used  extensiv ely  throughout  this  guide: •E S D ?[...]

  • Page 16

    Getting Help xiv About This Guide Getting Help For  additional  support  related  to  the  modules  or  this  document,  contact  Enterasys Networks  using  one  of  the  following  methods: Before  contacting  Enterasys Networks  for  technical  support,  have  the  followi[...]

  • Page 17

    Matrix DFE-Platinum Series Module Installation Guide 1-1 1 Introduction This  chapter  provides  an  overview  of  the  Matrix  DFE ‐ Diamond  7KR4297 ‐ 02  and  7KR429 7 ‐ 04  modules  and  optional  XFP  10 ‐ Gbps  physical  interface  module. Overview of Matrix DFE-Diamond Module C[...]

  • Page 18

    The DFE-Diamond 7KR4297-02 and 7KR4297-04 Mod ules 1-2 Introduction The DFE-Diamond 7KR4297-02 and 7KR4297-04 Modules This  section  provides  an  overview  of  the  7KR4297 ‐ 02  and  7KR4297 ‐ 04  DFE ‐ Diamond  modu les  shown  in  Figure 1 ‐ 1  and  Figure 1 ‐ 2 ,  as  wel l  as[...]

  • Page 19

    Management Matrix DFE-Platinum Series Module Installation Guide 1-3 Figure 1-2 7K R4297-04 D FE-Diamond M odule XFP 10GBASE-LR, -ER, -LX4, and -SR PHY S The  LAN  XFP  PHY s  (phy sical  interfaces)  provide  inexpensive,  high ‐ speed  Ethernet  connectivity .  These  PHY s  provide  networ k  manager[...]

  • Page 20

    Secure Networks Policy Support 1-4 Introduction Secure Networks Policy Support Po l i c y  Enabled  Netw orking  manages  the  allocation  of  netw orking  infrastructure  resources  in  a  secure  and  effecti ve  manner .  Using  Secure  Netw orks  Po l i c y ,  an  IT  Administrat[...]

  • Page 21

    Matrix DFE-Platinum Series Module Installation Guide 2-1 2 Network Requirements Before  in stalling  the  module,  review  the  requirements  and  specifications  referred  to  in  this  chapter  concerning  the  following:  The  network  installation  must  meet  the  requireme n[...]

  • Page 22

    Module Placement in a Matrix E7 Chassis 2-2 Network Requirements The  uplinks  hav e  one  fiber ‐ optic  interface  with  an  LC  conne ctor .  Depending  on  the  XFP  and  fiber ‐ optic  cable  used,  the  signal  can  be  driven  to  a  maximum  distance  of ?[...]

  • Page 23

    Matrix DFE-Platinum Series Module Installation Guide 3-1 3 Installation This  chapter  provides  the  instructions  to  install  the  DFE ‐ Diamond  module  and  optional  XFP  interface  modules. A  Phillips  screwdriver  is  required  to  ins tall  an  optional  int erface [...]

  • Page 24

    Unpacking the DFE-Diamond Module 3-2 Installation Unp a cking the DFE-Diamond Module Unpack  the  DFE ‐ Diamond  module  as  follows: 1. Open  the  box  and  remov e  the  packing  material  protecting  the  DFE ‐ Diamond  module. 2. V erify  the  contents  of  the  carton  as ?[...]

  • Page 25

    Backplane Connections and Installation Rules Matrix DFE-Platinum Series Module Installation Guide 3-3 Figure 3-1 Inst alling an XFP Removing an XFP Module To  remove  an  XFP  from  the  module  port,  refer  back  to  Fi gure 3 ‐ 1  and  proceed  as  follows: 1. Attach  the  antistatic  wrist[...]

  • Page 26

    Backplane Connections and Installation Rules 3-4 Installation The  DFE  FT M  bridging  modules  hav e  a  connection  to  both  FTM 1  an d  FT M 2  backplanes,  which  enables  them  to  switch  frames  between  the  tw o  backplanes  and  all  modul es  in  the ?[...]

  • Page 27

    Backplane Connections and Installation Rules Matrix DFE-Platinum Series Module Installation Guide 3-5 Example 2 ( Figure 3-1 , B) Shows  the  chassis  fully  populated  with  thi rd  generation  modules  (6x3xx).  Th ese  modules  can  also  be  installed  in  any  av ailable  chassis  slo[...]

  • Page 28

    Installing Module into Matr ix E7 or Matrix N7 Chassis 3-6 Installation Example 6 ( Figure 3-1 , F) The  module  arrangement  in  this  example  is  similar  to  the  one  shown  in  Figure 3 ‐ 1 ,  E and described  in  Example  5.  The  only  difference  is  that  a  DF E ?[...]

  • Page 29

    Installing Module into Matrix E7 or Matrix N7 Chassis Matrix DFE-Platinum Series Module Installation Guide 3-7 Inst allation To  install  the  module,  refer  to  Figure 3 ‐ 2  and  proceed  as  follows: 1. Locate  the  chassis  card  guides  that  line  up  with  the  slot  number ?[...]

  • Page 30

    Installing Module into Matr ix E7 or Matrix N7 Chassis 3-8 Installation Figure 3-2 Ins talling Module into Matrix E7 or Matrix N7 Chassis 1 Card guides 5 Upper/lower locking tabs (in p roper open position ) 2 Slot number 6 (left-most slot is 1) 6 Upper/lower locking tab (in clo sed position) 3 Module 7 Backplane connectors 4 Metal back panel - T op[...]

  • Page 31

    Installing Module into Matrix N3 Chassis Matrix DFE-Platinum Series Module Installation Guide 3-9 Inst alling Module into Matrix N3 Chassis A  DFE ‐ Diamond  module  can  be  installed  in  any  av ailable  chassis  slot  (1  through  3).  To  install  a  DFE ‐ Diamond  module  into  t[...]

  • Page 32

    Connecting to the Network 3-10 Installation Connecting to the Network Network Connection Using Fiber-Optic Cable To  connect  the  module  to  the  netw ork,  refer  to  Figure 3 ‐ 4  and  perform  the  following  steps: 1. Remove  any  protectiv e  covers  from  the  fi ber ‐ optic ?[...]

  • Page 33

    Connecting to COM Port for Local Management Matrix DFE-Platinum Series Module Installation Guide 3-11 3. At  the  other  end  of  the  fiber ‐ optic  cable,  attach  the  SC  connector  to  the  other  device.  4. V erify  that  a  link  exists  by  ch ecki ng  that  the  [...]

  • Page 34

    Connecting to COM Port for Local Management 3-12 Installation •R J 4 5 ‐ to ‐ DB25  female  adapter •R J 4 5 ‐ to ‐ DB25  male  adapter Wi t h  a  UTP  straight ‐ cable  with  RJ45  connectors  and  RJ45 ‐ to ‐ DB9  adapter ,  you  can  connect  products  equipped  with  [...]

  • Page 35

    Connecting to COM Port for Local Management Matrix DFE-Platinum Series Module Installation Guide 3-13 Connecting to a VT Series T erminal To  connect  a  VT  Series  terminal  to  an  Enterasys Netw orks  DFE ‐ Diamond  module  COM  port  ( Figure 3 ‐ 6 ),  use  a  UTP  straight ‐ cable  w[...]

  • Page 36

    Connecting to COM Port for Local Management 3-14 Installation When  these  parameters  are  set,  the  Local  Management  password  screen  will  display .  Refer  to  the  Enterasys  Matrix  DFE ‐ Diamond/Platinum  Serie s  Configuration  Guide  for  further  information. Conne[...]

  • Page 37

    Connecting to COM Port for Local Management Matrix DFE-Platinum Series Module Installation Guide 3-15 Adapter Wiring and Signal Assignment s Figure 3-7 Connecting to a Modem 1 UTP straight-cable with R J45 connectors 4 Local modem 2 RJ45 COM port 5 Remote modem 3 RJ45-to-DB25 male adapter COM Port Adapter Wir ing and Signal Diagram RJ45 DB9 Pin Con[...]

  • Page 38

    Completing the Installation 3-16 Installation Completing the Inst allation Completing  the  DFE ‐ Diamond  module  ins tallation  depends  on  if  the  module  is  being  installed  in: •a  new  DFE ‐ Diamond  module  system  (refer  to  “ Completing  the  Installation  of[...]

  • Page 39

    Completing the Installation Matrix DFE-Platinum Series Module Installation Guide 3-17 Completing the Inst all ation of a New System In  a  new  system  of  DFE ‐ Diamond  modules,  one  of  the  inst alled  DFE ‐ Diamond  modules  will  become  the  management  module  on  chassis  pow[...]

  • Page 40

    Completing the Installation 3-18 Installation Figure 3-8 Matrix DFE St artup Screen Example (N7 Chassis) Completing Inst allation of DFE-Diam ond Module in an Existing System In  an  established  DFE ‐ Diamond  module  system, •a  DFE ‐ Diamond  module  is  already  established  as  the  management  m[...]

  • Page 41

    Completing the Installation Matrix DFE-Platinum Series Module Installation Guide 3-19 The  DFE ‐ Diamond  module  is  now  ready  to  be  configured.  For  info rmation  about  setting  the  IP  address  and  configuring  Te l n e t  settings  for  remote  access  to  DFE [...]

  • Page 42

    Completing the Installation 3-20 Installation[...]

  • Page 43

    Matrix DFE-Platinum Series Module Installation Guide 4-1 4 T roubleshooting This  chapter  provides  information  concerning  the  following: Unless  otherwise  noted,  the  following  information  applies  to  all  DFE ‐ Diamond  modules. Using LANVIEW The  modules  use  a  built ‐ in[...]

  • Page 44

    Using LANVIEW 4-2 Troubleshooting Ta b l e 4 ‐ 1  describes  the  LED  indications  and  provides  recommended  actions  as  appropriate. Figure 4-1 LANVIEW LEDs 1 MGMT LED 3 Port 1, RX and TX LEDs 2 CPU LED 4 Port 2, RX and TX LEDs Note: The terms flashing , blinking , and so lid used in Ta b l e 4 - 1 indicate th e[...]

  • Page 45

    Using LANVIEW Matrix DFE-Platinum Series Module Installation Guide 4-3 CPU None Power off. Ensure chassis has a dequate power . Amber Blinking . Module i n process of booting. None. Solid . T esting. If the LED remains amber for several minutes, contact Enterasys Networks for technical support. Green Blinking . Image start s running. None. Solid . [...]

  • Page 46

    Troubleshooting Checklist 4-4 Troubleshooting T roubleshooting Checklist If  the  module  is  not  work i ng  properly ,  refer  to  Ta b l e 4 ‐ 2  for  a  checklist  of  problems,  possible  causes,  and  recommended  actions  to  resolve  the  problem. T able 4-2 T roubleshoo[...]

  • Page 47

    Overview of DFE-Diamond Module Shutdown Proced ure Matrix DFE-Platinum Series Module Installation Guide 4-5 Overview of DFE-Diamond Module Shut down Procedure The  DFE ‐ Diamond  modules  instal led  in  a  Matri x  E7,  Matrix  N3 ,  or  Matrix  N7  chassis  are  interdependent  and  operate [...]

  • Page 48

    Overview of DFE-Diamond Module Shutdown Pro cedure 4-6 Troubleshooting Recommended Shut down Procedure Using OFFLINE/RESET Swi tch Before  pulling  a  DFE ‐ Diamond  module  out  of  a  chassis,  press  or  tap  on  its  OFFLINE/RESET  switch  for  less  than  1 second.  Its  CPU  [...]

  • Page 49

    Overview of DFE-Diamond Module Shutdown Proced ure Matrix DFE-Platinum Series Module Installation Guide 4-7 Last Resort Shut down Proced ure Using OFFLINE/RESET Switch To  reset  a  DFE ‐ Diamond  module  without  it  performing  an  orderly  shutdown  routine,  press  and  ho ld  the OFFLINE/RESET [...]

  • Page 50

    Overview of DFE-Diamond Module Shutdown Pro cedure 4-8 Troubleshooting[...]

  • Page 51

    Matrix DFE-Platinum Series Module Installation Guide A-1 A Specifications This  appendix  provides  information  about  the  foll owing: Enterasys Networks  reserves  the  right  to  change  the  specifications  at  any  time  without  notice. DFE-Diamond Module S pecifications Ta b l e A ‐ 1 [...]

  • Page 52

    10-Gigabit Ethernet Transceiver Specifications (XFP) A-2 Specifications 10-Gigabit Ethernet T ranscei ver Specifications (XFP) The  10 ‐ Gigabit  XFP  (10 ‐ Gigabit  Small  Form  Factor  Pluggable)  interface  port  slots  on  DFE ‐ Platinum  mo dule s  can  support  va r i o us  optional [...]

  • Page 53

    COM Port Pinout Assignments Matrix DFE-Platinum Series Module Installation Guide A-3 Ta b l e A ‐ 3  provides  the  input/output  specifications  for  each  XFP  ver si on  as  specified  in  the  IEEE  802.3ae ‐ 2002  standard. The  following  XFP  specifications  in  Ta b l e A ‐ 4[...]

  • Page 54

    Regulatory Compliance A-4 Specifications Regulatory Compliance The  7KR4297 ‐ 02  and  7KR4297 ‐ 04  modules  meet  the  safety  and  electromagnetic  compatibility  (EMC)  requirements  listed  in  Ta b l e A ‐ 6 : T able A-6 Compliance S t andards Regulatory Compliance St andards Safety UL 60950,[...]

  • Page 55

    Matrix DFE-Platinum Series Module Installation Guide B-1 B Mode Switch Bank Settings and Optional Installations This  appendix  covers  the  following  items: Required T ools Use  the  following  tools  to  perform  the  procedures  provided  in  this  appendix: •A n t i s t a t i c  wrist  st[...]

  • Page 56

    Memory Locations and Replacement Procedures B-2 Mode Switch Bank Settings and Optional Installations •S w i t c h  7  –  Clear  Per s i s t e n t  Data.  Changing  the  position  of  this  switch  clears  Pe r s i s t e n t  Data  on  the  next  power ‐ up  of  the  module.  Al[...]

  • Page 57

    Memory Locations and Replacement Procedures Matrix DFE-Platinum Series Module Installation Guide B-3 Location of DIMM and DRAM SIMM Memory Modules Figure B ‐ 2  shows  the  locations  of  the  DIMM  and  DRAM  SIMM  on  the  main  board.  DRAM SIMM Replacement Procedure To  remove  and  replace ?[...]

  • Page 58

    Memory Locations and Replacement Procedures B-4 Mode Switch Bank Settings and Optional Installations 3. Pull  the  DRAM  SIMM  straig ht  up  and  remo ve  it  from  the  connector  finger s. Inst alling the DRAM SIMM To  install  a  DRAM  SIMM,  refer  to  Figure B ‐ 4  and  proceed [...]

  • Page 59

    Memory Locations and Replacement Procedures Matrix DFE-Platinum Series Module Installation Guide B-5 DIMM Replacement Procedure In  the  event  that  the  DIMM  need s  to  be  replaced,  the  following  sections  explain  how  to  remove  and  install  the  DIMM.  If  you  have ?[...]

  • Page 60

    Memory Locations and Replacement Procedures B-6 Mode Switch Bank Settings and Optional Installations 3. Rotate  the  DIMM  upw ards,  then  remove  it  fro m  the  connector  fingers. Inst alling the DIMM To  install  a  DIMM,  refer  to  Figure B ‐ 6  and  proceed  as  follows: 1. Inser[...]

  • Page 61

    Memory Locations and Replacement Procedures Matrix DFE-Platinum Series Module Installation Guide B-7 Figure B-6 Installing the DIMM 1 DIMM 3 Connector arms 2 Connector fingers 4 DIMM alignment notches (2) Â Á Ã Ã Â À[...]

  • Page 62

    Memory Locations and Replacement Procedures B-8 Mode Switch Bank Settings and Optional Installations[...]

  • Page 63

    Index-1 Index Numerics 10GBASE-xx module installing a 3-2 10-Gigabit Ethernet Transcei ver Specifications (XFP) A-2 7KR4297-02 introduction to 1-2 7KR4297-04 Introduction to 1-2 A Acronyms commonly used xiii C Capabilities DFE module 1- 1 CLI command introduction to 1-3 COM port connections what is needed 3- 1 1 Connecting to the network 3-10 Conne[...]

  • Page 64

    Index-2[...]