APC UCCS Temperature Control manual

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42

Go to page of

A good user manual

The rules should oblige the seller to give the purchaser an operating instrucion of APC UCCS Temperature Control, along with an item. The lack of an instruction or false information given to customer shall constitute grounds to apply for a complaint because of nonconformity of goods with the contract. In accordance with the law, a customer can receive an instruction in non-paper form; lately graphic and electronic forms of the manuals, as well as instructional videos have been majorly used. A necessary precondition for this is the unmistakable, legible character of an instruction.

What is an instruction?

The term originates from the Latin word „instructio”, which means organizing. Therefore, in an instruction of APC UCCS Temperature Control one could find a process description. An instruction's purpose is to teach, to ease the start-up and an item's use or performance of certain activities. An instruction is a compilation of information about an item/a service, it is a clue.

Unfortunately, only a few customers devote their time to read an instruction of APC UCCS Temperature Control. A good user manual introduces us to a number of additional functionalities of the purchased item, and also helps us to avoid the formation of most of the defects.

What should a perfect user manual contain?

First and foremost, an user manual of APC UCCS Temperature Control should contain:
- informations concerning technical data of APC UCCS Temperature Control
- name of the manufacturer and a year of construction of the APC UCCS Temperature Control item
- rules of operation, control and maintenance of the APC UCCS Temperature Control item
- safety signs and mark certificates which confirm compatibility with appropriate standards

Why don't we read the manuals?

Usually it results from the lack of time and certainty about functionalities of purchased items. Unfortunately, networking and start-up of APC UCCS Temperature Control alone are not enough. An instruction contains a number of clues concerning respective functionalities, safety rules, maintenance methods (what means should be used), eventual defects of APC UCCS Temperature Control, and methods of problem resolution. Eventually, when one still can't find the answer to his problems, he will be directed to the APC service. Lately animated manuals and instructional videos are quite popular among customers. These kinds of user manuals are effective; they assure that a customer will familiarize himself with the whole material, and won't skip complicated, technical information of APC UCCS Temperature Control.

Why one should read the manuals?

It is mostly in the manuals where we will find the details concerning construction and possibility of the APC UCCS Temperature Control item, and its use of respective accessory, as well as information concerning all the functions and facilities.

After a successful purchase of an item one should find a moment and get to know with every part of an instruction. Currently the manuals are carefully prearranged and translated, so they could be fully understood by its users. The manuals will serve as an informational aid.

Table of contents for the manual

  • Page 1

    JANUARY 2008 UCCS STANDARDS 15950-1 UCCS Temperature Co ntrol Specifiers Guide Mechanical Division 15950: Basi c Control Materials and Methods I. Part 1 - Gen eral 1.01 Special Conditions 1.02 Scope 1.03 Related Work Specified Els ewhere 1.04 Work Included 1.05 Definitions 1.06 Drawing and Specifications 1.07 Submittal Data and Shop Drawings 1.08 P[...]

  • Page 2

    JANUARY 2008 UCCS STANDARDS 15950-2 SECTION 15950 CONTROLS [Note to Consultant: These st andards incorporate the sugges ted wording for contract specifications. The consultant is responsibl e for making sure that the specifications are edited to meet the scop e and intent of the project. Items which specifically require editing are highlighted in b[...]

  • Page 3

    JANUARY 2008 UCCS STANDARDS 15950-3 flows, shall be by the Balancing Contractor. Th e Controls Contractor sh all provide assis- tance to the Balanc ing Contractor with control adjustments as required to obtain design flows by: 1. Providing on-site instruction on the pr oper interfacing and operation of their equipment 2. Providing the necessary s o[...]

  • Page 4

    JANUARY 2008 UCCS STANDARDS 15950-4 and approval. D. Coordination: This Contractor shall interf ace with controls furnished with equipment. Provide additional control devices , interlock relays, and signal conditioners when necessary to accomplish specifi ed sequences. E. The system shall include all interlocks, field devices, wiring, piping, hardw[...]

  • Page 5

    JANUARY 2008 UCCS STANDARDS 15950-5 scope of dem olition is unclear, cons ult with Shop technician prior to bid subm ittal. Approval from HVAC/Controls must be give n prior to bid sub m ittal fo r waiver of demoli tion. 1.05 DEFINITIONS A. These specifications and draw ings require finished work, tested, and ready for operation. Wherever the word &[...]

  • Page 6

    JANUARY 2008 UCCS STANDARDS 15950-6 and product data shall be submitted for a ppr oval per Division 1, Section 01300. B. Contractor agrees that shop drawings and/or submittals processed by the Engineer are not change orders, that the purpose of shop drawings and/or subm ittals by the Contractor is to inform the Engineer which equi pm ent and materi[...]

  • Page 7

    JANUARY 2008 UCCS STANDARDS 15950-7 c. Panel software name and serial number d. Type of controller: The network diagram sh all depict the actual connection sequence of the devices, includin g distances between devices, type of wire us ed and serial number of controll er. 2. The second drawing in the control package shall consist of actual installat[...]

  • Page 8

    JANUARY 2008 UCCS STANDARDS 15950-8 b. Sequence of operation fo r all controlled and monitore d points for each system. Sequence shall be on sa me drawing as corre sponding system schematic . c. A complete input/ output sche dule for e ach DDC pa nel and dedi cat ed co ntroll er including point name (the same name to be used in software), functiona[...]

  • Page 9

    JANUARY 2008 UCCS STANDARDS 15950-9 B. Prior to Final Completion of the insta llati on, prepare complete Oper ation and Maintenance manuals. Refer to Division 1, Section 01300, an d Division 15, Secti on 15050, for require- ments. Also provide one set of digital medi a containing all CAD-prepared drawings. The file format shall conform to the requi[...]

  • Page 10

    JANUARY 2008 UCCS STANDARDS 15950-10 two- to four-hour sessio ns over the life of the warranty period. All in stru ctional material shall be ava ilable to each em ploy ee at each training se ssion up to a maximum of ten (10) individual s. F. All demonstration and traini ng sessions sha ll be coordinated with the Univ ersity HVAC supervi sor. 1.10 W[...]

  • Page 11

    JANUARY 2008 UCCS STANDARDS 15950-11 E. The Contractor shall optim ize all contro l software and tune all control loops to assure acceptable operating and space conditions and peak energy effici ency. This shall include changes needed to optimize operati on of the systems even if not explicitly described in Control Strategies. F. The Contractor sha[...]

  • Page 12

    JANUARY 2008 UCCS STANDARDS 15950-12 3. Project database, 4. Job-specific applica tion programming code, 5. All other documentation. PART 2 - PRODUCTS 2.01 MANUFACTURERS A. Regardless of the manufacturer , the specific products a nd desi gn chosen shal l meet the requirements of this specification. B. Use the manufacturers list ed below or in the d[...]

  • Page 13

    JANUARY 2008 UCCS STANDARDS 15950-13 1. 2" - 12" Size; Siemen s 2-way Butterfly Assemblies with Siemens Electric Actuators or pre-approved eq ual; Keystone Fig. 222. d. Two-Position or Modulated, Single-Butterfly Valve applications. 2”-12” Size; Keystone Fi g. 222, Johnson VF Series Powers/Siemens BV2W Series with electric actuator a.[...]

  • Page 14

    JANUARY 2008 UCCS STANDARDS 15950-14 e. Desiccant Compressed Air Dryer 1. Hankison Dehydrafilter , or approved equal. 7. Actuators and Positioners - Pneumatic a. Johnson, Kreuter, Powers, H oneywell, or approved equal. b. Butterfly-valve actuator 1. Powers, Johnson ,Keystone Fig. 790, or approved equal. 8. Auxiliary Devi ces - Pneumatic a. Room The[...]

  • Page 15

    JANUARY 2008 UCCS STANDARDS 15950-15 4. Duct-mounted a. (UCCS to add preferre d manufacturer here) 10. Transmitters - Solid State a. Water, Compressed Air, St eam pressure transmitters 1. See 2.11 B [3.] b. Water differential pressure transmitters 1. Rosemount series 3051 or pre-approved equal c. Water differential pressure transmitters 1. Dwyer Ca[...]

  • Page 16

    JANUARY 2008 UCCS STANDARDS 15950-16 1. Barksdale, Mercoid series 1000 or pre-approved equal. c. Horn Strobe 1. Federal Model 400ST with Mode l 350 horn and LCMB bracket. d. Multi-Level Control Panel for Liquids 1. McDonnell Miller PCH-G or pre-approve d equal with proper NEMA Rating. e. Refrigerant Vapor Sensor 1. Trane, General Analysis Corporati[...]

  • Page 17

    JANUARY 2008 UCCS STANDARDS 15950-17 2.02 AIR TUBING AND CONTROL WIRING A. Air tubing shall be e ither copper (ACR) in ex posed areas, or Type FR polyethylene (within conduit). Soft copp er i s acceptable in concealed areas. B. Cables shall be shielded when so recommen ded by manufacturer. Conductor size shall be in accordance with manufacturer&apo[...]

  • Page 18

    JANUARY 2008 UCCS STANDARDS 15950-18 2. Sizing Criteria: a. Two-positio n service: Line size. b. Two-way modulating servi ce: Pressure drop across th e valve in a wide-ope n position, with full flow through the valve, sha ll be equal to 50% of the available pressure d ifferen tial be tween the main s, with a m inim um of 4 ps i. c. Three-way Modula[...]

  • Page 19

    JANUARY 2008 UCCS STANDARDS 15950-19 5. Individual damper se ctions shall not have a single dimensi on (length or height) greater than 48". Provide a minimum of one da mper actuator per section. 6. Modulating dampers shall provide a linear flow characteristic where possible. Size the dampers to achieve this characteristic and and consider appr[...]

  • Page 20

    JANUARY 2008 UCCS STANDARDS 15950-20 let within 5’ of the enclosure. G. All control panel lo cks shall conform to the Universit y standard l ock for cont rol cabinet s. Contractor shall give the keys to the HV AC Shop at completio n of training. 2.06 COMPRESSED AIR SUPPLY - PNEUMATIC [Note to Consultant: Describe the pneumat ic air source for the[...]

  • Page 21

    JANUARY 2008 UCCS STANDARDS 15950-21 3. Refrigerant for the dryer shall be R-13 4A, or approve d, non-CFC, alternate. 4. Dryers Shall be adjusted for 6,400 feet above sea level. C. Filter and PRV Station: 1. Provide a two-stage, aerosol, coalescing au todrain, submicron type air filter assembly with replaceable element, 99.99% efficient fo r solids[...]

  • Page 22

    JANUARY 2008 UCCS STANDARDS 15950-22 provide smooth, reliable actuation at all times. Modulating valves shall be complete with positioners by the same manuf acturer. W here indicated, posi tion switches by the same manufacture r shall be provided. 2.08 AUXILIARY DEVICES - P NEUMATIC A. Room Thermostats: 1. All room therm ostats shall be high-capaci[...]

  • Page 23

    JANUARY 2008 UCCS STANDARDS 15950-23 a. Pneumatic signals: 0-20 psig. b. Electric signals: 4 to 20 mA 2. Span (calibration) and start point shall be fully adjustable. E. Indicating Gauges and Test Ports: 1. Control-signal indicat ing and test gauges sh all be 1- 1/2", back-con nected, 0 to 30 psig. 2. Test ports on the air lines co nnected to [...]

  • Page 24

    JANUARY 2008 UCCS STANDARDS 15950-24 2. Line-voltage thermostats shall be UL-liste d, SPDT, SPST, or DPST with contact rat- ing suitable for application, ma ximum 2F different ial. 3. Low-voltage thermostats shall be single or multi-stage heati ng and/or cooling type as required by application. a. Combination heating/cooling thermostats shall have [...]

  • Page 25

    JANUARY 2008 UCCS STANDARDS 15950-25 arrangement and rating suitable for application; line voltage units UL-listed. E. CO 2 sensors: 1. (UCCS to add CO 2 sensor product requirements here) (LEED EQc1: Carbon Dioxide Monitoring) 2.10 SOLID-STATE SE NSIN G DEVICES A. Space (room) sensors shall be surface-mounted. Space sensors shall have an exposed se[...]

  • Page 26

    JANUARY 2008 UCCS STANDARDS 15950-26 response time. Zero and span shall be a djustable. KELE M odel PTXIE, or equal. Instal l with is ola tion va lve. 4. Water differential pressure transmitters for flow measurement shall have stainless steel diaphragm construction, proof-pressure of 150 psi minim um, and the accuracy shall be 0.25% of calibrated s[...]

  • Page 27

    JANUARY 2008 UCCS STANDARDS 15950-27 2.12 AUXILIARY DEVICE S - ELECTRIC A. Flow-proving or equipment-op erating-status switches shall be paddle, di fferential-pressure, or current-sensing types as indicated below. 1. Paddle-type switches (water service only) shall be UL-l isted, SPDT snap-acting with pilot duty rating (125 VA mini mum). Adjustable [...]

  • Page 28

    JANUARY 2008 UCCS STANDARDS 15950-28 I. Refrigerant Vapor Sensor: Analyzer shall be microprocesso r-based and employ infrared (lR) sensor technology, to prov ide sensing down t o one (1) pa rt per million (ppm) and shall be chemical-compound-specific and calibrated fo r either refrigerant R-11, R-12, R-22, R- 123, R-134a, or ot her refrigera nt as [...]

  • Page 29

    JANUARY 2008 UCCS STANDARDS 15950-29 provide smooth modulating co ntrol under design flow a nd pressure conditions. 2. Valve actuators shal l provi de tight close- o ff at de sign sys tem press ure. Mo dulati ng actuators shall provide smooth modulation at design flow a nd pressure conditions. 3. Provide feedback transmitters and/or end switches wh[...]

  • Page 30

    JANUARY 2008 UCCS STANDARDS 15950-30 Installation methods/ma terials as follows: 1. Concealed and Inaccessible: Copper tubing (type ACR) with out jo ints or FR plastic without joints in metal conduit . Exceptions: Room thermo stat drops in stud w alls may be FR plastic tubing in ar eas with lay-in ceiling. Lines encased in concrete must be in metal[...]

  • Page 31

    JANUARY 2008 UCCS STANDARDS 15950-31 D. Provide ball valves or manifold if specified to isolate the instruments from the process. E. Impulse Line piping for flow transm itters. The following information to be used f or proper location & piping of differentia l pressure transmitters. 1. For liquid flow measurement taps should be made to the side[...]

  • Page 32

    JANUARY 2008 UCCS STANDARDS 15950-32 I. Low-voltage (24V or less) AC or DC wiring shall not be run in conduit containing 120 VAC wiring. J. Infinet Communication Wiring: 1. Splicing is not acceptable. 2. Label all junction boxes. Labels provided by the UCCS HVAC Shop K. Label all temperature control wiring and pneum atic tubing junction box covers [...]

  • Page 33

    JANUARY 2008 UCCS STANDARDS 15950-33 terminal on the controller. C. Expansion Modules: Delta DDC 1. The Controls contractor shall follow the sp ecifications shown in th e Delt a Hardware Installation Guide unless stated otherwise herein. 2. The use of Delta DCC expansion Modules shall be pre-approved by the University HVAC Shop. 3. Expansion module[...]

  • Page 34

    JANUARY 2008 UCCS STANDARDS 15950-34 1. Not allowed. D. Standard Nomenclature for Valve and Damper Position Description: 1. Set up the conversion table for each valve or damper control out put so that 100% OPEN = open and 0% OPEN = closed. 2. For mixed-air dampers, 100% OPEN = fully open outside air damper and closed return damper. 3. For face and [...]

  • Page 35

    JANUARY 2008 UCCS STANDARDS 15950-35 L. For all applications utilizing outside-air, reli ef, isolation or ex haust dampers; ins tall an E/P to automatically close the dampers when its associ ated air-handling unit or fan is turned off. The E/P shall be wired (not thru software) so th e damper is closed when the fan or AHU is turned off with the sta[...]

  • Page 36

    JANUARY 2008 UCCS STANDARDS 15950-36 3.07 CONTROL PANELS A. Refer to Part 2 - Produc ts for construction details. B. Field wiring shall be in conduit . C. Panels shall be wall-mounted at eye level for accessibility and service. D. Local control panels shall be loca ted within same room of system se rved otherwise location shall be appr oved by UCCS[...]

  • Page 37

    JANUARY 2008 UCCS STANDARDS 15950-37 information. 6. When connecting DDC controllers, terminat ing of inputs and outputs shall be color coded as follows : 120VAC shall be black = hot, white = neutral, green = ground 24VAC shall be (+) blac k with white tracer, (-) white with black tracer 24VDC shall be (+) re d with black tracer, (-) black with red[...]

  • Page 38

    JANUARY 2008 UCCS STANDARDS 15950-38 formance tests. B. The tests described in this section are to be performed in addition to the tests that the Contractor performs as a necessary part of the installation, startup, and debugging process. Control system testing shall be co ordinated with t he HVAC Shop. C. The Contractor shall prov ide at least two[...]

  • Page 39

    JANUARY 2008 UCCS STANDARDS 15950-39 F. This Contractor sh all demonstrate HVAC alarms prio r to placing ventilation system s in service. G. The control systems will not be accepted as meeting the Requirements of Com pletion until all tests described in this sect ion have been performed to the satisfaction of both the Engi- neer and Owner. Any test[...]

  • Page 40

    JANUARY 2008 UCCS STANDARDS 15950-40 G. System logs, trend logs, and event-initia ted logs shall be set up to provide historical and real-time monitoring of system operation. Logs shall be grouped by equipment. H. Safety Shutdowns - Bo ilers and Chiller: Boilers and/ or ch iller will be pr ovided with all required safety controls as specified in Di[...]

  • Page 41

    JANUARY 2008 UCCS STANDARDS 15950-41 j. Each miscellane ous m onitored or co ntrolled poi nt 2. Menu Penetrations: “Buttons” shall be pr ovided to allow the us er to easily move among the various graphics and menus. At any tim e, the operator shall be able to return to the main menu with one mouse clic k and shall switch from graphic to other m[...]

  • Page 42

    JANUARY 2008 UCCS STANDARDS 15950-42 temperature controls contractor. The contractor shall conf irm tha t th e communication network linking cont rollers within the [Add building name] functions prope rly, before connecting the new controllers to the campus network. 3.15 DDC SOFTWARE A. Provide sufficient inte rnal memory for the sp ecified control[...]