Anchor Hocking Glass NAV40GBL-1104 manual

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16

Go to page of

A good user manual

The rules should oblige the seller to give the purchaser an operating instrucion of Anchor Hocking Glass NAV40GBL-1104, along with an item. The lack of an instruction or false information given to customer shall constitute grounds to apply for a complaint because of nonconformity of goods with the contract. In accordance with the law, a customer can receive an instruction in non-paper form; lately graphic and electronic forms of the manuals, as well as instructional videos have been majorly used. A necessary precondition for this is the unmistakable, legible character of an instruction.

What is an instruction?

The term originates from the Latin word „instructio”, which means organizing. Therefore, in an instruction of Anchor Hocking Glass NAV40GBL-1104 one could find a process description. An instruction's purpose is to teach, to ease the start-up and an item's use or performance of certain activities. An instruction is a compilation of information about an item/a service, it is a clue.

Unfortunately, only a few customers devote their time to read an instruction of Anchor Hocking Glass NAV40GBL-1104. A good user manual introduces us to a number of additional functionalities of the purchased item, and also helps us to avoid the formation of most of the defects.

What should a perfect user manual contain?

First and foremost, an user manual of Anchor Hocking Glass NAV40GBL-1104 should contain:
- informations concerning technical data of Anchor Hocking Glass NAV40GBL-1104
- name of the manufacturer and a year of construction of the Anchor Hocking Glass NAV40GBL-1104 item
- rules of operation, control and maintenance of the Anchor Hocking Glass NAV40GBL-1104 item
- safety signs and mark certificates which confirm compatibility with appropriate standards

Why don't we read the manuals?

Usually it results from the lack of time and certainty about functionalities of purchased items. Unfortunately, networking and start-up of Anchor Hocking Glass NAV40GBL-1104 alone are not enough. An instruction contains a number of clues concerning respective functionalities, safety rules, maintenance methods (what means should be used), eventual defects of Anchor Hocking Glass NAV40GBL-1104, and methods of problem resolution. Eventually, when one still can't find the answer to his problems, he will be directed to the Anchor Hocking Glass service. Lately animated manuals and instructional videos are quite popular among customers. These kinds of user manuals are effective; they assure that a customer will familiarize himself with the whole material, and won't skip complicated, technical information of Anchor Hocking Glass NAV40GBL-1104.

Why one should read the manuals?

It is mostly in the manuals where we will find the details concerning construction and possibility of the Anchor Hocking Glass NAV40GBL-1104 item, and its use of respective accessory, as well as information concerning all the functions and facilities.

After a successful purchase of an item one should find a moment and get to know with every part of an instruction. Currently the manuals are carefully prearranged and translated, so they could be fully understood by its users. The manuals will serve as an informational aid.

Table of contents for the manual

  • Page 1

    40’ Wide Gabled End System Quality , Craft smanship and Service since 1892 NA V40Gbl-1 104 Copyright © Anchor Industries 2004 Please read all assembly / installation instructions before the inst allation or removal of this product. 1 100 Burch Dr ., Evansville, IN 47725 Ph. 812-867-2421 • Fx. 812-867-0547 E-mail: tents@anchorinc.com • www .a[...]

  • Page 2

    T ABLE OF CONTENTS Page No. Assembly S tep 3 Introduction with Frame T erminology Illustration 4 Component Illustrations 5 40’ Navi-T rac Component List T able 6 40’ Navi-T rac Component List T able Cont’d 7 Safety Guidelines 8 Squaring the T ent Footprint Layout and Diagonals Chart 9 Assembling the first Beam Assembly Layout of all Beams (Bu[...]

  • Page 3

    3 40’ Gabled Navi-T rac Frame T erminology INTRODUCTION: Like the hip-end version, the gabled end NA VI-TRAC frame is made up of extruded aluminum members joined by weldments. The aluminum frame members themselves are extruded with channels into which the NA VI- TRAC fabric “kedar” is fed. However , the gabled end version of the Navi-T rac di[...]

  • Page 4

    40’ NA VI-TRAC COMPONENT ILLUSTRA TIONS 4[...]

  • Page 5

    40’ NA VI-TRAC COMPONENT LIST A MINIMUM GABLED UNIT CONSISTS OF (1) KIT #1, (1) KIT #2 AND (2) EXTENSION MIDS. TO EXTEND THE LENGTH FURTHER, SIMPL Y ADD ADDITIONAL EXTENSION MIDS. ST ARTER MIDS ARE REQUIRED WITH HIP ENDS ONL Y . I.D. 40’ GABLED END NA VI-TRAC LABEL (LETTER ON DRA WING) COMPONENT DESCRIPTION CODES (ST AMPED OR T APED) GBL KIT 1 [...]

  • Page 6

    6 I.D. 40’ GABLED END NA VI-TRAC LABEL (LETTER ON DRA WING) COMPONENT DESCRIPTION CODES (ST AMPED OR T APED) GBL KIT 1 GBL KIT 2 HIP KIT 3 20’ MID STR 20’ MID EXT 15’ MID STR 15’ MID EXT 10’ MID STR 10’ MID EXT ST AKES, CABLES & WEB GUYS **OPTIONS OF 10’,15’, OR 20’ BA YS MUST BE SPECIFIED. G NA VI-TRAC WEB GUYS 2 5 2 2 2 2 [...]

  • Page 7

    7 NA VI-TRAC INST ALLA TION SAFETY GUIDELINES Y our installation techniques will evolve to fit the needs of your clients, the experience level of your crews, the nature of other tentage on-site, and the equipment that you have most readily available. W e encourage you to begin with a crew of (4) workers and only reduce this number as your experienc[...]

  • Page 8

    DIRECTIONS FOR SQUARING THE TENT 1. USE A T APE MEASURE TO MARK THE ENDS OF A LINE FOR ONE END (A TO B ABOVE) EQUAL TO THE EXACT WIDTH OF THE UNIT . 2. HOLD THE “0” END OF ONE T APE A T POINT “A” AND THE “0” END OF ANOTHER T APE A T POINT “B”. 3. EXTEND THE FIRST T APE ALONG ONE SIDE OF THE UNIT TO A MEASUREMENT EQUAL TO THE EXACT L[...]

  • Page 9

    9 1 3 4 2 6 5 CONSTRUCT FIRST BEAM LA YOUT OF ALL BEAMS MCW RW ON MID BEAMS, R WE ON END BEAMS R21-9 U8 BHW T -30 XRB FOR (X-CABLED BEAMS ONL Y) MAKE CONNECTIONS IN NUMBER SEQUENCE SHOWN. ST AKE PLA TES BEFORE ERECTING . 7 8 9 10 FIRST (2) BEAMS BUTTERFLIED SO THA T ADJACAENT BASE PLA TE ST AKES CAN BE USED FOR SAFETY GUYING . (2ND BEAM WILL BE RAI[...]

  • Page 10

    10 ERECTING 2nd BEAM 1st SECURING THE 1st BEAM SAFEL Y ERECTING THE 2nd BEAM WORKERS LIFT FIRST A T THE PEAK, THEN SHUFFLE SIDEW A YS TOW ARD THE UPRIGHTS. AS THE 2ND BEAM PIVOTS TOW ARD VER TICAL, THE TRAILING SAFETY WEBS DRA W TIGHTER. USING RA TCHETS, ADJUST LEADING AND TRAILING SAFETY WEBS AGAINST EACH OTHER ON BOTH SIDES OF THE STRUCTURE TO SE[...]

  • Page 11

    11 SECURING THE 2nd BEAM WITH DROP-IN RIDGE/EA VE BARS INST ALLING PURLINS AND RIDGE BARS COMPLETING THE 1ST BA Y IN 20’ MID BA YS ONL Y , INST ALL A SUPPORT PURLIN BETWEEN THE EA VE AND THE PURLIN A T THE MID-RAFTER LOCA TION. THIS SUPPORT WILL BRACE AGAINST INW ARD DEFLECTION OF THE EA VE BA Y THA T COULD OTHER WISE RESUL T IN W A TER PONDING I[...]

  • Page 12

    12 COMPLETING THE TOP FRAME INST ALLING GABLED END FRAME INST ALLING GUY WEBS BEFORE INST ALLING F ABRIC ST AKING DISCLAIMER: DUE TO V ARYING SOIL CONDITIONS A T EACH INST ALLA TION SITE, THE ST AKES PROVIDED MA Y NOT MEET THE LOADING REQUIREMENT SHOWN ON THE BLUEPRINT AND ENGINEERING ANAL YSIS. IT IS THE INST ALLERS RESPON- SIBILITY TO VERIFY THE [...]

  • Page 13

    13 INST ALLING MID P ANEL PULL MID P ANEL UP AND OVER THROUGH CHANNELS IN RAFTER EXTRUSIONS. WHEELED P ANEL GUIDE RAFTER INSERT FINGERS OF WHEELED P ANEL GUIDE INTO THE OPEN END OF THE RAFTER AND WELDMENT . TIGHTEN THE BUTTERFL Y NUT . REVERSE FOR OPPOSITE SIDE OF BA Y . F ABRIC TENSIONING 1. USE WEB/ RA TCHETS TO SECURE CA TENARY ARCHES TO UPRIGHT[...]

  • Page 14

    14 COMPLETED 40’ GABLED END NA VI-TRAC WITH F ABRIC INST ALLED AND TENSIONED, GUY WEBS ST AKED AND RA TCHETED TIGHT . TO MEET ENGINEERING REQUIREMENTS W ALLS SHOULD BE INST ALLED ON ALL (4) SIDES. 40’ x 80’ GABLED END NA VI-TRAC AL TERNA TE HIP/GABLED END COMBINA TION USING KIT #3 FOR THE HIP COMPONENTS (SEE P AGE 14 FOR ASSEMBL Y REFERENCE)[...]

  • Page 15

    15 HIP/GABLED END COMBINA TION UNIT SEE THE ST ANDARD NA VI-TRAC INST ALLA TION INSTRUCTIONS FOR ASSEMBL Y OF THE HIP END UNIT . EXTENSION BEAMS ARE PIVOTED IN THE SAME MANNER AS SHOWN ABOVE IN THIS GABLED END ASSEMBL Y INSTRUCTION. SEE BELOW FOR COMPONENTS THA T MUST BE SUBSTITUTED IN HIP END UNIT (SEE KIT #3) E20 EIW CW BFW H21-4 MRW EFW TFW ML W[...]

  • Page 16

    EV ANSVILLE, INDIANA 28.3 1 1-01-02 Thank you for purchasing an Anchor product. In return, we pledge Quality , Service and Craft smanship and are available for any questions you may have or assistance you may need. PHONE NUMBER 812-867-2421 F AX NUMBER 812-867-0547 Anchor products are of superior design and operate best within the p arameters of th[...]