AMX Wall Docking Station MVP-WDS manual

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38

Go to page of

A good user manual

The rules should oblige the seller to give the purchaser an operating instrucion of AMX Wall Docking Station MVP-WDS, along with an item. The lack of an instruction or false information given to customer shall constitute grounds to apply for a complaint because of nonconformity of goods with the contract. In accordance with the law, a customer can receive an instruction in non-paper form; lately graphic and electronic forms of the manuals, as well as instructional videos have been majorly used. A necessary precondition for this is the unmistakable, legible character of an instruction.

What is an instruction?

The term originates from the Latin word „instructio”, which means organizing. Therefore, in an instruction of AMX Wall Docking Station MVP-WDS one could find a process description. An instruction's purpose is to teach, to ease the start-up and an item's use or performance of certain activities. An instruction is a compilation of information about an item/a service, it is a clue.

Unfortunately, only a few customers devote their time to read an instruction of AMX Wall Docking Station MVP-WDS. A good user manual introduces us to a number of additional functionalities of the purchased item, and also helps us to avoid the formation of most of the defects.

What should a perfect user manual contain?

First and foremost, an user manual of AMX Wall Docking Station MVP-WDS should contain:
- informations concerning technical data of AMX Wall Docking Station MVP-WDS
- name of the manufacturer and a year of construction of the AMX Wall Docking Station MVP-WDS item
- rules of operation, control and maintenance of the AMX Wall Docking Station MVP-WDS item
- safety signs and mark certificates which confirm compatibility with appropriate standards

Why don't we read the manuals?

Usually it results from the lack of time and certainty about functionalities of purchased items. Unfortunately, networking and start-up of AMX Wall Docking Station MVP-WDS alone are not enough. An instruction contains a number of clues concerning respective functionalities, safety rules, maintenance methods (what means should be used), eventual defects of AMX Wall Docking Station MVP-WDS, and methods of problem resolution. Eventually, when one still can't find the answer to his problems, he will be directed to the AMX service. Lately animated manuals and instructional videos are quite popular among customers. These kinds of user manuals are effective; they assure that a customer will familiarize himself with the whole material, and won't skip complicated, technical information of AMX Wall Docking Station MVP-WDS.

Why one should read the manuals?

It is mostly in the manuals where we will find the details concerning construction and possibility of the AMX Wall Docking Station MVP-WDS item, and its use of respective accessory, as well as information concerning all the functions and facilities.

After a successful purchase of an item one should find a moment and get to know with every part of an instruction. Currently the manuals are carefully prearranged and translated, so they could be fully understood by its users. The manuals will serve as an informational aid.

Table of contents for the manual

  • Page 1

    Installation Guide Touch Panels & Accessories MVP-WDS Wall Docking Station for MVP-7500/8400 Modero ® ViewPoint ® Wireless Touch Panels Last Revised: 12/15/200 8[...]

  • Page 2

    AMX Limited Warranty and Disclaimer AMX warrants its products to be free of defects in material and workmanship under n ormal use for three (3) years from the date of purchase fr om AMX, with the following exceptions: • Electroluminescent and LCD Control P ane ls are warranted for three (3) years, except for the display and touch overlay componen[...]

  • Page 3

    FCC Information This device complies with Part 15 of the FCC Rules. Operati on is subject to the followi ng two conditions: (1) this device may not cause harmful interference, and (2) this device must accept any interference rece ived; in cluding inte rference that may cause undesi red operation. Federal Communications Commission (FCC) Statement Th[...]

  • Page 4

    [...]

  • Page 5

    Table of Contents i MVP-WDS Wall Docking Station for MVP Panels Table of Contents MVP-WDS Wall Docking Station & CB-MVPWDS Rou gh-In Box ......................... 1 Overview .............................. ......................... ................... ......................... ............... 1 Specification s ............ ................ .....[...]

  • Page 6

    ii MVP-WDS Wall Docking Station for MVP Panels Table of Contents[...]

  • Page 7

    MVP-WDS Wall Docking Station & CB-MVPWDS Rough-In Box 1 MVP-WDS Wall Docking Station for MVP Panels MVP-WDS Wall Docking Station & CB-MVPWDS Rough-In Box Overview The MVP-WDS W all/Flush Mount Docking Station (FIG. 1) pro vides a surface-installed docking location. MVP-WDS stations use a security latch to secure the panel to the docking sta[...]

  • Page 8

    MVP-WDS Wall Docking Station & CB-MVPWDS Rough-In Box 2 MVP-WDS Wall Docking Station for MVP Panels Specifica tions MVP-WDS Specifications Dimensions (HWD): • 8.59" x 12.66" x 3.40" (21.82 cm x 32.16 cm x 8.64 cm) Note : Always use the cutout/installat ion dimensions for the MVP-WDS when installing this unit into various surfac[...]

  • Page 9

    MVP-WDS Wall Docking Station & CB-MVPWDS Rough-In Box 3 MVP-WDS Wall Docking Station for MVP Panels MVP-WDS docking station co nnector locations FIG. 2 shows the layout of the connectors on the right side of the MVP-WDS. LED Indicators The two LEDs located within the security release pushbutton on the front panel (FIG. 1) indicate battery and c[...]

  • Page 10

    MVP-WDS Wall Docking Station & CB-MVPWDS Rough-In Box 4 MVP-WDS Wall Docking Station for MVP Panels Installation MVP-WDS wall-docking stations can be installed either the CB-MVPWDS or othe r solid surface en vironment using one of the two mounting o ptions: drywall clips or solid surface s cr ews, as described in the following sub-sections. Ins[...]

  • Page 11

    MVP-WDS Wall Docking Station & CB-MVPWDS Rough-In Box 5 MVP-WDS Wall Docking Station for MVP Panels 2. Using either nails or screws, fasten the rough-in box to the stud through the fiv e Stud Fastening Holes. 3. Remove the wiring knockouts from the right side of the rough-in box to accommodate cabling to the MVP-WDS. 4. Thread the USB and Power[...]

  • Page 12

    MVP-WDS Wall Docking Station & CB-MVPWDS Rough-In Box 6 MVP-WDS Wall Docking Station for MVP Panels 4. Close the battery cov er and disconnect the power connector to remo ve po wer from the unit and maintain the support cradle in the forward position. 5. Remov e the two #6-32 F aceplate Security Screws from the top rim of the faceplate, using a[...]

  • Page 13

    MVP-WDS Wall Docking Station & CB-MVPWDS Rough-In Box 7 MVP-WDS Wall Docking Station for MVP Panels 8. Press down on the Security Latch to allow it to go through the top op ening. 9. Grasp the top rim of the faceplate and carefully slide it over the cradle (at an angle) until the faceplate is completely removed from the WDS (FIG. 8). Once the f[...]

  • Page 14

    MVP-WDS Wall Docking Station & CB-MVPWDS Rough-In Box 8 MVP-WDS Wall Docking Station for MVP Panels Installing the MVP-WDS in a CB- MVPWDS Rough-In Box  The rough-in box must be mounted prior to continuing this section. Refer to the Installing the CB-MVPWDS Rough-In Box section on page 4 for de tailed pre-wall installation instructions.  [...]

  • Page 15

    MVP-WDS Wall Docking Station & CB-MVPWDS Rough-In Box 9 MVP-WDS Wall Docking Station for MVP Panels 3. Using a grounded Phillips-head screwdriv er , insert and secure four #6-32 Mounting Screws (not included) into their corresponding holes loca ted along the sides of the MVP-WDS until the W DS is securely fastened to the rough-in box, and is fl[...]

  • Page 16

    MVP-WDS Wall Docking Station & CB-MVPWDS Rough-In Box 10 MVP-WDS Wall Docking Station for MVP Panels 2. Thread the USB and Power cables through the surface opening, leaving enough slack in the wiring to accommodate re-positioning of the unit. 3. Connect the 2-pin power connector and USB cables to the WDS. The WDS must be installed with these at[...]

  • Page 17

    MVP-WDS Wall Docking Station & CB-MVPWDS Rough-In Box 11 MVP-WDS Wall Docking Station for MVP Panels 6. T ighten all four drywall clip sets (scre ws and clips) until both Mounting T abs are securely fastened and flush against the wall. 7. Follo w the steps outlined in the Replacing the F aceplate on the MVP-WDS section on page 13 to angle the M[...]

  • Page 18

    MVP-WDS Wall Docking Station & CB-MVPWDS Rough-In Box 12 MVP-WDS Wall Docking Station for MVP Panels 2. Thread the USB and Power cables through the surface opening, leaving enough slack in the wiring to accommodate any re-positioning of the unit. 3. Connect the 2-pin power connector and USB cables alo ng the right side of the (un-powered) MVP-W[...]

  • Page 19

    MVP-WDS Wall Docking Station & CB-MVPWDS Rough-In Box 13 MVP-WDS Wall Docking Station for MVP Panels 7. Insert and secure four #4-40 Mounting Screws ( not included) into their corresponding holes located along the sides of the WDS (using a grounded Phillips-head screwdri ver) until the WDS is secured and is flush against the wall. 8. Follo w th[...]

  • Page 20

    MVP-WDS Wall Docking Station & CB-MVPWDS Rough-In Box 14 MVP-WDS Wall Docking Station for MVP Panels 7. Apply power to the MVP-WDS by connecting the terminal end of the power cable to the po wer supply . 8. Press the Cradle Acti vation pushb utton to cause the MVP Support Cradle to angle backwards and lie flush against the main unit. 9. Remov e[...]

  • Page 21

    MVP-WDS Wall Docking Station & CB-MVPWDS Rough-In Box 15 MVP-WDS Wall Docking Station for MVP Panels Connecting and Usi ng USB In put Devices on the Stations The MVP-WDS can have up to two USB input de vices connected for use on the MVP panel’ s different firmw are and TPD4 panel page s. These input devices can consist of a ke yboard and mous[...]

  • Page 22

    MVP-WDS Wall Docking Station & CB-MVPWDS Rough-In Box 16 MVP-WDS Wall Docking Station for MVP Panels Securing an MVP Panel to an MVP-WDS 1. Place the MVP-WDS on a flat and lev el surface. 2. Provide po wer to the MV P-WDS (refer to the P owering the MVP-WDS section on page 14). 3. Place the MVP on the support cradle so that the alignment pins o[...]

  • Page 23

    MVP-WDS Wall Docking Station & CB-MVPWDS Rough-In Box 17 MVP-WDS Wall Docking Station for MVP Panels Removing an MVP Panel from an MVP-WDS The MVP security feature enables a security code that is entered into an on-screen password keypad. This password is conf igured within the MVP panel’ s P assword Setup page. Refer to the MVP-7500/8400 Ope[...]

  • Page 24

    MVP-WDS Wall Docking Station & CB-MVPWDS Rough-In Box 18 MVP-WDS Wall Docking Station for MVP Panels Undock-<USER> Stri ng When the MVP is removed from the docking station (undocked), the undock-<user> string is sent to the NetLinx Master .  If the panel has no info rmation within the User A ccess Passwords list, ’ none ’ is [...]

  • Page 25

    MVP-WDS Wall Docking Station & CB-MVPWDS Rough-In Box 19 MVP-WDS Wall Docking Station for MVP Panels Installing the MVP-WDS-SK Silver Conversion Kit The VP-WDS-SK Silver Con version Kit (FG5965-22) contains the following components:  One Silver Cradle Bezel/Faceplate (60-5965-20SL)  One Silver Cradle Pi vot ( Support Cr adle ) (60-5965-21[...]

  • Page 26

    MVP-WDS Wall Docking Station & CB-MVPWDS Rough-In Box 20 MVP-WDS Wall Docking Station for MVP Panels 7. Disconnect the 2-pin mini-Phoenix connec tor from the side of the docking station to re mov e power from the unit and maintain the support cradle in this angled position. 8. Close the battery cov er . 9. Remov e the two #6-32 Faceplate Securi[...]

  • Page 27

    MVP-WDS Wall Docking Station & CB-MVPWDS Rough-In Box 21 MVP-WDS Wall Docking Station for MVP Panels 14. Press downward on the Security Latch (tow ards the pushbutton) to get it to go through the top opening and allow the faceplate’ s remov al. 15. Grab the top rim of the faceplate and carefully slid e it o ver the cradle (at an angle) until [...]

  • Page 28

    MVP-WDS Wall Docking Station & CB-MVPWDS Rough-In Box 22 MVP-WDS Wall Docking Station for MVP Panels 4. Carefully remov e the cradle piv ot’ s attachment screw and place it aside for later re-attachment. 5. Carefully slide the black piv ot cradle combo unit (battery cover/support cradle) up from the metallic housing and use the screwdri ver t[...]

  • Page 29

    MVP-WDS Wall Docking Station & CB-MVPWDS Rough-In Box 23 MVP-WDS Wall Docking Station for MVP Panels 8. Carefully place the first circuit board aside and rota te the black piv ot combo unit over to expose the second circuit board attached to the backside of the unit ( B in FIG. 25). 9. Carefully remove this second board by unscrewing the three [...]

  • Page 30

    MVP-WDS Wall Docking Station & CB-MVPWDS Rough-In Box 24 MVP-WDS Wall Docking Station for MVP Panels 5. Use the scre wdriv er to install one of the previous ly remo ved MVP Support Cradle Securing scre ws to the securing plate (shown in FIG. 24 on pa ge 22). 6. Carefully slide the entire silver battery pi vot combo unit into the black WDS metal[...]

  • Page 31

    MVP-WDS Wall Docking Station & CB-MVPWDS Rough-In Box 25 MVP-WDS Wall Docking Station for MVP Panels  Open the Battery Compartment by pressing down on the Battery Compartment Latch and then pulling the cov er outwards.  Press the Cradle Acti vation pushb utton (the sma ll recessed white button lo cated near the pins in Battery Slot #2) to[...]

  • Page 32

    MVP-WDS Wall Docking Station & CB-MVPWDS Rough-In Box 26 MVP-WDS Wall Docking Station for MVP Panels[...]

  • Page 33

    Upgrading the Docking Station Firmw are 27 MVP-WDS Wall Docking Station for MVP Panels Upgrading the Docking Station Firmware The following accessory de vices are firmware upgradeable:  MVP-TDS T able T op Dockin g Station ( FG5965-10 )  MVP-WDS W all/Flush Mount Docking Station - Black ( FG5965-11 )  MVP-WDS W all/Flush Mount Docking Stat[...]

  • Page 34

    Upgrading the Docking Station Firmware 28 MVP-WDS Wall Docking Station for MVP Panels Step 2: Upgrade t he Docking Station firmware v ia USB 1. Configure the panel for a USB Connection T ype. 2. Prepare NetLinx Studio for comm unication to the panel v ia a V irtual Master . 3. After the Communication V erification dialog windo w verifies acti ve co[...]

  • Page 35

    Upgrading the Docking Station Firmw are 29 MVP-WDS Wall Docking Station for MVP Panels 10. Click the Reboot Device checkbox. This cause s the touch panel to reboo t after the firmware update process is complete. The r eboot of the panel can take up 30 seconds after the f irmwar e pr ocess has finished. 11. Click Send to begin the transfer . The fil[...]

  • Page 36

    Upgrading the Docking Station Firmware 30 MVP-WDS Wall Docking Station for MVP Panels Although firmware u pgrades can be don e over wirele ss Ethernet; it is recommended that firmware KIT files be transfer red over a direct USB connection and only when the panel is connected to a power supply . If battery power or wireless connection fails during a[...]

  • Page 37

    Upgrading the Docking Station Firmware 31 M VP-WDS Wall Docking Station for MVP Pan els[...]

  • Page 38

    12/08 © 2008 AMX. All rights reserved. AMX a nd the AMX logo are regist ered trademarks of AMX. AMX rese rves the right to alter specific ations without no tice at any time. It’s Your World - Take Con trol™ 3000 RESEARCH DRIVE, RICHARDSON, TX 75082 USA • 800.222.0193 • 469.624.8000 • 469-624-7153 fax • 800.932.6993 technical support ?[...]