Ametrix CPP/CPS manual

1
2
3
4
5

Go to page of

A good user manual

The rules should oblige the seller to give the purchaser an operating instrucion of Ametrix CPP/CPS, along with an item. The lack of an instruction or false information given to customer shall constitute grounds to apply for a complaint because of nonconformity of goods with the contract. In accordance with the law, a customer can receive an instruction in non-paper form; lately graphic and electronic forms of the manuals, as well as instructional videos have been majorly used. A necessary precondition for this is the unmistakable, legible character of an instruction.

What is an instruction?

The term originates from the Latin word „instructio”, which means organizing. Therefore, in an instruction of Ametrix CPP/CPS one could find a process description. An instruction's purpose is to teach, to ease the start-up and an item's use or performance of certain activities. An instruction is a compilation of information about an item/a service, it is a clue.

Unfortunately, only a few customers devote their time to read an instruction of Ametrix CPP/CPS. A good user manual introduces us to a number of additional functionalities of the purchased item, and also helps us to avoid the formation of most of the defects.

What should a perfect user manual contain?

First and foremost, an user manual of Ametrix CPP/CPS should contain:
- informations concerning technical data of Ametrix CPP/CPS
- name of the manufacturer and a year of construction of the Ametrix CPP/CPS item
- rules of operation, control and maintenance of the Ametrix CPP/CPS item
- safety signs and mark certificates which confirm compatibility with appropriate standards

Why don't we read the manuals?

Usually it results from the lack of time and certainty about functionalities of purchased items. Unfortunately, networking and start-up of Ametrix CPP/CPS alone are not enough. An instruction contains a number of clues concerning respective functionalities, safety rules, maintenance methods (what means should be used), eventual defects of Ametrix CPP/CPS, and methods of problem resolution. Eventually, when one still can't find the answer to his problems, he will be directed to the Ametrix service. Lately animated manuals and instructional videos are quite popular among customers. These kinds of user manuals are effective; they assure that a customer will familiarize himself with the whole material, and won't skip complicated, technical information of Ametrix CPP/CPS.

Why one should read the manuals?

It is mostly in the manuals where we will find the details concerning construction and possibility of the Ametrix CPP/CPS item, and its use of respective accessory, as well as information concerning all the functions and facilities.

After a successful purchase of an item one should find a moment and get to know with every part of an instruction. Currently the manuals are carefully prearranged and translated, so they could be fully understood by its users. The manuals will serve as an informational aid.

Table of contents for the manual

  • Page 1

    Installat ion Instructi ons Vault w/ visor C-Scroll w/ visor Roundel w/ visor These ins tallation instructions are valid with the above Ametrix styles Warning : Before star ting any work ensure that all sources of power are turned off. All work must meet l ocal/nati onal co des and be performed by a certifi ed ele ctrici an. Do not mount fixt ures [...]

  • Page 2

    These instructions are valid for both PP and PS mounting assemblies. Secure both pendant assemblies to ceiling before attaching fixture head. 1. Remove canopy and allow i t to slide down pen dant. 2. Refer to power orientation supplementary sheet for power location. 3. Run wiring from j-box d own pendant tube and using #8-32 x1/2" Pan head scr[...]

  • Page 3

    2 3 32 " 52.84 Installat ion Instructi ons Vault w/ visor C-Scroll w/ visor Roundel w/ visor These ins tallation instructions are valid with the above Ametrix styles Warning : Before star ting any work ensure that all sources of power are turned off. All work must meet l ocal/nati onal co des and be performed by a certifi ed ele ctrici an. Do [...]

  • Page 4

    Wiring fixtures to J-box 1. Remove bo th #6-32 x3/8" Pan head screws and slide cente r cover pla te down. 2. Run p ower wire f rom fixture thr ough hu b and i nto center yoke bracket. 3. Secure f irst fixture to center yoke bra cket using #10 -32 x5/8" end screw. 1. Mount next center o r end pe ndant d ependi ng on l ength o f run. 2. Run[...]

  • Page 5

    Installat ion Instructi ons Vault w/ visor C-Scroll w/ visor Roundel w/ visor These ins tallation instructions are valid with the above Ametrix styles Warning : Before star ting any work ensure that all sources of power are turned off. All work must meet l ocal/nati onal co des and be performed by a certifi ed ele ctrici an. Do not mount fixt ures [...]