Allied Air Enterprises 506271-01 manual

1
2
3
4
5
6
7
8
9
10
11
12
13
14

Go to page of

A good user manual

The rules should oblige the seller to give the purchaser an operating instrucion of Allied Air Enterprises 506271-01, along with an item. The lack of an instruction or false information given to customer shall constitute grounds to apply for a complaint because of nonconformity of goods with the contract. In accordance with the law, a customer can receive an instruction in non-paper form; lately graphic and electronic forms of the manuals, as well as instructional videos have been majorly used. A necessary precondition for this is the unmistakable, legible character of an instruction.

What is an instruction?

The term originates from the Latin word „instructio”, which means organizing. Therefore, in an instruction of Allied Air Enterprises 506271-01 one could find a process description. An instruction's purpose is to teach, to ease the start-up and an item's use or performance of certain activities. An instruction is a compilation of information about an item/a service, it is a clue.

Unfortunately, only a few customers devote their time to read an instruction of Allied Air Enterprises 506271-01. A good user manual introduces us to a number of additional functionalities of the purchased item, and also helps us to avoid the formation of most of the defects.

What should a perfect user manual contain?

First and foremost, an user manual of Allied Air Enterprises 506271-01 should contain:
- informations concerning technical data of Allied Air Enterprises 506271-01
- name of the manufacturer and a year of construction of the Allied Air Enterprises 506271-01 item
- rules of operation, control and maintenance of the Allied Air Enterprises 506271-01 item
- safety signs and mark certificates which confirm compatibility with appropriate standards

Why don't we read the manuals?

Usually it results from the lack of time and certainty about functionalities of purchased items. Unfortunately, networking and start-up of Allied Air Enterprises 506271-01 alone are not enough. An instruction contains a number of clues concerning respective functionalities, safety rules, maintenance methods (what means should be used), eventual defects of Allied Air Enterprises 506271-01, and methods of problem resolution. Eventually, when one still can't find the answer to his problems, he will be directed to the Allied Air Enterprises service. Lately animated manuals and instructional videos are quite popular among customers. These kinds of user manuals are effective; they assure that a customer will familiarize himself with the whole material, and won't skip complicated, technical information of Allied Air Enterprises 506271-01.

Why one should read the manuals?

It is mostly in the manuals where we will find the details concerning construction and possibility of the Allied Air Enterprises 506271-01 item, and its use of respective accessory, as well as information concerning all the functions and facilities.

After a successful purchase of an item one should find a moment and get to know with every part of an instruction. Currently the manuals are carefully prearranged and translated, so they could be fully understood by its users. The manuals will serve as an informational aid.

Table of contents for the manual

  • Page 1

    506271-01 Page 1 of 14 Issue 0921 Save these instructions for future reference INST ALLA TION INSTRUCTIONS RPGE/RGE Series Gas Heating/Electric Cooling Package Unit Do not store combustible materials, including gasoline and other flammable vapors and liquids, near the furnace, vent pipe, or warm air ducts. Such actions could cause property damage, [...]

  • Page 2

    Page 2 of 14 506271-01 Issue 0921 INST ALLA TION T hese instructions must be hung on or near the furnace in a conspicuous place. These furnace units are single package air conditioners with gas heat designed for outdoor installation on a roof top or a slab. The units are completely assembled. All piping, refrigerant charge, and electrical wiring ar[...]

  • Page 3

    506271-01 Page 3 of 14 Issue 0921 In the U.S., units may be installed on combustible floors made from wood or class A, B, or C roof covering material. In Canada, units may be installed on combustible floors. Units must be installed out doors. Service Access Access to all serviceable components is provided by four removable panels: blower comp artme[...]

  • Page 4

    Page 4 of 14 506271-01 Issue 0921 Minimum horizontal clearance of 4' from electric meters, gas meters, regulator , and relief equipment is required. In addition to the above requirements, consideration must be given to prevent unwanted ice buildup from the vent condensate. The vent should not be located on the side of a building where the prev[...]

  • Page 5

    506271-01 Page 5 of 14 Issue 0921 The supply and return air duct systems should be designed for the CFM and static requirement s of the job. They should not be sized by matching the dimensions of the duct connections on the unit. Filters Filters are not supplied with the unit. Filters must always be installed ahead of the evaporator coil and must b[...]

  • Page 6

    Page 6 of 14 506271-01 Issue 0921 Gas piping recommendations: • A drip leg and a ground joint union must be installed in the gas piping. A ground joint union is recommended by the manifold/valve. • When required by local codes, a manual shutoff valve may have to be installed outside of the unit. • Use pipe thread sealing compound resistant to[...]

  • Page 7

    506271-01 Page 7 of 14 Issue 0921 All wiring should be done in accordance with the National Electrical Code, ANSI/NFP A No. 70 (latest edition); Canadian Electrical Code Part 1, CSA C22.1 (latest edition); or local codes where they prevail. Use wiring with a temperature limitation of 75°C minimum. Run the 208 or 230 volt, 60 hertz electric power s[...]

  • Page 8

    Page 8 of 14 506271-01 Issue 0921 ST ART -UP Pre-St art Check List Complete the following checks before starting the unit: 1. Check the type of gas being supplied. Be sure it is the same as listed on the unit nameplate. 2 . Make sure that the vent cover has been properly installed. For Y our Safety Read Before Lighting T o Light Main Burners: 1. T [...]

  • Page 9

    506271-01 Page 9 of 14 Issue 0921 Manifold Gas Pressure Adjustment Regulator – Natural Gas For purpose of input adjustment, the minimum permissible gas supply pressure is 5" w .c. for natural gas. Gas input must never exceed the input capacity shown on the rating plate. The furnace is equipped for natural gas rated input s with manifold pres[...]

  • Page 10

    Page 10 of 14 506271-01 Issue 0921 7. After reassembly of all p arts is complete and all wires are reconnected, open the main manual gas shutoff valve; check for and correct any gas leaks. T urn electrical power on, initiate a call for heat, and check for proper burner operation. 8. Install burner access panel. Heat Anticipator The heat anticipator[...]

  • Page 11

    506271-01 Page 11 of 14 Issue 0921 10-second interval, then the ignition control will de- energize the gas valve. 6. The ignition control is designed to repeat this “trial for ignition” a total of three times. If, at the end of the third trial, flame still has not been established, then the ignition control will try to light again 1 hour later [...]

  • Page 12

    Page 12 of 14 506271-01 Issue 0921 Burners T o clean the burners, first remove them from the furnace as explained in Burner Instructions on page 9. V acuum and/or brush as required. V ent Outlet Visually inspect vent outlet periodically to make sure that there is no buildup of soot or dirt. If necessary , clean to maintain adequate opening to disch[...]

  • Page 13

    506271-01 Page 13 of 14 Issue 0921 Wiring Diagram – Single Phase Figure 8[...]

  • Page 14

    Page 14 of 14 506271-01 Issue 0921 NOTES[...]